HomeMy WebLinkAbout15 COW Public 05 December 2011 Minutes Report 1 Public
REPORT NO. 1, SPECIAL COMMITTEE OF THE WHOLE (PUBLIC)
New Chapman Mills/South Nepean Area Review
DATE: 05 December 2011
A special meeting of the Committee of the Whole (Public) was held this evening in the Board
Room, 133 Greenbank Road, Ottawa, Ontario, commencing at 7:30 p.m. with Trustee Bronwyn
Funiciello in the chair and the following trustees also in attendance: Donna Blackburn, Rob Campbell,
Cathy Curry (electronic communication), Mark Fisher, Katie Holtzhauer (electronic communication),
Theresa Kavanagh, Jennifer McKenzie, Lynn Scott, Shirley Seward and John Shea.
STAFF: Director of Education and Secretary of the Board, Jennifer Adams; Associate Director of
Education, Walter Piovesan; Superintendent of Instruction, Peter Gamwell; Manager of Planning, Karyn
Carty Ostafichuk; Manager of Board Services, Monica Ceschia; Planners, Ian Baxter and Lisa Gowans;
Communications Coordinator, Sharlene Hunter; Audio Visual Specialist, John MacKinnon; and Board
Committee/Coordinator, Sue Baker.
1. Call to Order
Chair Funiciello called the meeting to order at 7:30 p.m.
2. Approval of Agenda
Moved by Trustee Shea,
THAT the agenda be approved.
- Carried -
3. Public Question Period
a. Christina Thiele
Christina Thiele queried the number of students in Grade 6 at Adrienne Clarkson
Elementary School, Berrigan Elementary School, and Farley Mowat Public School who would
move to Grade 7 at Longfields-Davidson Heights Secondary School over the next five years. She
submitted that the flow of students would increase over time and if an extension to Longfields-
Davidson Heights Secondary School is not a capital priority for the Board, then students would
need to be bussed out of the community as there would be no place else for them to go.
Manager Ostafichuk advised that staff is projecting an average of 300 students entering
Grade 7 next year, 370 students in 2013, 360 student in 2014, 323 students in 2015 and 300
students in 2016.
Special Committee of the Whole (Public) - 1 - 05 December 2011
New Chapman Mills/South Nepean Area Review
b. Ravinder Minhas
Ravinder Minhas expressed concern about compliance with Canada Labour Code
standards with regard to the number of employees and students using Longfields-Davidson
Heights Secondary School facilities, including exits and washrooms, if an extension to the school
was not constructed. She asked about the maximum capacity of the school, including portables,
and whether the Board has a contingency plan for the school if funding for an extension was not
approved.
Manager Ostafichuk advised that ratios for the number of occupants to washrooms and
exits are established in building and fire codes. She noted that Longfields-Davidson Heights
Secondary School has sufficient facilities to accommodate more occupants than its original stated
capacity, and it also has an oversized gymnasium. She noted that the province is well aware of
the overcrowding issues in Barrhaven, and staff believes a good business case can be made for an
addition to the school.
c. Vicki Cunliffe
Vicki Cunliffe, speaking about the transition of students from Barrhaven Public School to
the new Chapman Mills elementary school, inquired whether there would be a requirement for
portables at either the former Parkwood Hills Public School or the new Chapman Mills
elementary school, and, if so, how would children be better served than if they remained at
Barrhaven Public School.
Manager Ostafichuk advised that there would likely be a couple of portables required at
the former Parkwood Hills Public School. She noted the benefits of forming the new Chapman
Mills elementary school at the beginning of the school year at the Parkwood Hills site, and that
the number of portables would be considerably fewer than would be required at Barrhaven Public
School. With regard to the requirement for portables at the new Chapman Mills elementary
school, Manager Ostafichuk added that portables are not foreseen at the present time, but it is
anticipated that they would be required in the future.
4. Delegations
a. Taz Mawji and Lauralee Comeau, Co-chairs, Longfields-Davidsons Heights Secondary
School
Taz Mawji and Lauralee Comeau, Co-chairs, Longfields-Davidsons Heights Secondary
School (LDHSS), expressed their support for the staff recommendation outlined in Report 11-189
to make the construction of an addition to LDHSS a capital priority. They noted that LDHSS is
currently over capacity and has 10 portables on site. Present attendance records in feeder schools
indicate that over 300 students would enter the school in September 2012. Ms Mawji submitted
that with a projected utilization rate of approximately 131 percent in 2012, rising to 141 percent
in 2013, and 152 percent in 2014, the school, including 24 portables onsite, would exceed its
capacity.
Ms Mawji and Ms Comeau noted that a neighbouring secondary school operated by a
coterminous board has added an extension and does not have any portables onsite. They
suggested that students may opt to move to the other school board if LDHSS was not expanded.
Noting the number of new homes built in Barrhaven over the past 9 years and planned for the
Special Committee of the Whole (Public) - 2 - 05 December 2011
New Chapman Mills/South Nepean Area Review
future, they submitted that additional school facilities are required at LDHSS. The presenters
urged trustees to approve the recommendations in the staff report.
Trustee Shea thanked Ms Mawji and Ms Comeau for their presentation and asked
whether the school council had explored the option of converting LDHSS into a grade 9-12
school. Ms Comeau expressed the opinion that if students leave the school in Grade 7 to attend a
school operated by a coterminous board, they would not return to LDHSS for Grade 9. She
estimated that if the students are moved out the area, the school would lose approximately 40
students per year to the coterminous board.
In response to a query from Trustee McKenzie, Ms Mawji advised that they based their
projected enrolment numbers on the approximately 1,000 new homes slated to be built in the
neighbourhood over the next six to eight years. She noted that the number of students in grades 4
and 5 are increasing and LDHSS is an attractive option for parents looking for a grade 7-12
school.
Trustee Campbell asked the presenters if they had considered the possibility of
constructing an additional secondary school rather than building an addition to LDHSS. Ms
Comeau expressed the opinion that while another school is required, obtaining funding and
constructing a new secondary school would take considerably more time than building an
addition to LDHSS. She noted that building plans and the land for an addition are already in
place and the need for additional space in the next two years is immediate.
b. Lisa Hopkyns, Stonebridge Community Association, re Keeping the Community
Together
Lisa Hopkyns submitted that the Stonebridge Community Association is deeply
concerned about the staff recommendations in Report 11-189 regarding the new Chapman Mills
Elementary School and grade structures in the South Nepean Area. She expressed the opinion
that the principle of keeping communities together is being ignored in regards to the Stonebridge
community, and that the community does not view Jockvale Road as a physical boundary for the
division of attendance areas between East and West Stonebridge. She added that Stonebridge
East has a declining elementary population and only 84 students would be directed from that area
to the new Chapman Mills elementary school next year. Ms Hopkyns urged the Board members
to find a solution that does not divide the Stonebridge community and allows the students to
remain at Barrhaven Public School with their friends and relatives.
Trustee Fisher thanked Ms Hopkyns for her presentation and asked her how she derived
her enrolment projections. Ms Hopkyns advised that her projections for Stonebridge East were
calculated by visiting the school and daycare centres in the area and counting students. She stated
that, in her opinion, the staff projections did not consider the demographics of the area, the price
of homes, and the average age of homeowners in Stonebridge East. She submitted that
Stonebridge West has younger children and is almost completely developed.
4. Report 11-189, New Chapman Mills Elementary School Review of Boundaries, Programs and
Grade Structures in South Nepean, Staff Recommendation
Your Committee had before it report 11-189 seeking approval of
attendance boundary, and grade structure for the new Chapman Mills elementary school to be opened in
South Nepean as well the revised attendance boundaries and grade structures for existing area elementary
schools in association with the opening of the new Chapman Mills elementary school.
Special Committee of the Whole (Public) - 3 - 05 December 2011
New Chapman Mills/South Nepean Area Review
Chair Funiciello noted that staff had presented report 11-189 at the Committee of the Whole
(Public) New Chapman Mills/Barrhaven Area Review meeting of 14 November 2011.
Moved by Trustee Blackburn,
A. THAT attendance boundaries and programs for the new Chapman Mills
elementary school be approved as per Appendix 5 of Report No. 11-189, with the
school formed in September 2012 with a JK to 4 grade structure, advancing to JK
to 5 for September 2013.
B. THAT effective September 2012, the new Chapman Mills elementary school be
accommodated temporarily at the former Parkwood Hills Public School site on
Tiverton Drive until the new Chapman Mills elementary school building is
completed.
C. THAT the grade structures at Barrhaven Public School and Cedarview Middle
School temporarily become JK-4 and 5-8 for the school years 2012-2013, 2013-
2014, and 2014-2015.
D. THAT revised attendance boundaries for Barrhaven Public School, Farley
Mowat Public School, Jockvale Elementary School, Mary Honeywell Elementary
School and Cedarview Middle School be approved as per Appendix 6 of Report
No. 11-189, effective September 2012.
E. THAT revised attendance boundaries for John McCrae Secondary School and
Longfields-Davidson Heights Secondary School be approved as per Appendix 7
of Report No. 11-189.
F. THAT current Barrhaven Public School JK to 3 students (2011-2012) residing in
the Half Moon Bay boundary area remain at Barrhaven Public School and that
their siblings be given a one-time option to choose to attend that school.
G. THAT current Barrhaven Public School JK to 3 students (2011-2012) residing in
the Barrhaven Mews boundary area remain at Barrhaven Public School and that
their siblings be given a one-time option to choose to attend that school.
H. THAT current Barrhaven Public School grade 4 students (2011-2012) residing in
the Half Moon Bay, Barrhaven Mews, Stonebridge East, and Hearts Desire
boundary areas be directed to Cedarview Middle School for grade 5.
I. THAT preferred busing be provided to those students attending the new
Chapman Mills elementary school while it is temporarily accommodated at the
former Parkwood Hills Public School site on Tiverton Drive.
J. THAT busing be provided to and from existing childcare locations for those
students whose existing childcare arrangement will no longer be within their
arrangement is made for that student within their designated school attendance
boundary or until the end of the 2012-2013 school year.
Special Committee of the Whole (Public) - 4 - 05 December 2011
New Chapman Mills/South Nepean Area Review
K. THAT an addition to Longfields-Davidson Heights Secondary School be made a
capital priority and that preliminary design and site work be commenced.
L. THAT a new elementary school in the Half Moon Bay portion of South Nepean
be reconfirmed as a capital priority in order to ensure that funding is provided in
a fashion which would permit a 2015 planned opening.
M. THAT staff examine the feasibility of introducing the Full-Day Kindergarten
program at the new Chapman Mills elementary school for September 2013, one
year earlier than currently scheduled.
Trustee Blackburn introduced the motion and thanked the members of the working group
and staff for their time and effort on the New Chapman Mills/Barrhaven Area Review. She noted
that it has taken considerable time to conduct the area review and she urged her fellow trustees to
support all of the proposed recommendations.
Staff responded to a number of queries from trustees and the following points were
noted:
With regard to the recommended boundaries for John McCrae Secondary School,
students residing in Half Moon Bay would continue to have the option to attend
either John McCrae Secondary School or South Carleton High School. If most
students in this area opted to attend John McCrae Secondary School then the school
may experience overcrowding and the boundaries may need to be re-evaluated at
some point in the future;
The cost of opening the former Parkwood Hills Public School is approximately
$200,000 and includes portables, communication systems, and WiFi installation;
The benefits of forming the new Chapman Mills elementary school in September
2012 at the former Parkwood Hills Public School site include the establishment of a
learning community at the beginning of the school year with staff in place for the
entire year, and time for students to get to know each other before moving into the
new school. Additional portables would be required to accommodate these students
if they were to remain at Farley Mowat Public School and Barrhaven Public School;
The Board reviews its capital priorities on an annual basis prior to budget
discussions;
While many schools across the district would prefer to implement Full-Day
Kindergarten (FDK) earlier than scheduled, staff is recommending that the feasibility
of introducing FDK at the new Chapman Mills elementary school one year earlier
than scheduled be examined in the context of all FDK goals throughout the district
and as part of the allocation of provincial capital funding for year four of FDK
implementation;
The success of the recommendations depends on the opening of a new school in Half
Moon Bay in 2015 and the construction of an addition to Longfields-Davidson
Heights Secondary School. The province is aware that OCDSB is a growth board,
without surplus pupil places, and the need for new schools in Barrhaven is acute;
Original student enrolment projections for the Stonebridge community were based on
subdivision development plans with housing types that were originally planned for
the community but not actually constructed. Staff is confident that current
projections for the next two years are accurate and conservative;
Jockvale Road, while not a community boundary, is considered by staff to be a
reasonable school boundary. Based on enrolment projections, it is not feasible to
Special Committee of the Whole (Public) - 5 - 05 December 2011
New Chapman Mills/South Nepean Area Review
accommodate East and West Stonebridge elementary students at one school in the
longer term;
Permitting students who currently reside in Half Moon Bay to remain at Barrhaven
Public School while directing new Half Moon Bay residents to Jockvale Elementary
School would alleviate some of the overcrowding at Barrhaven Public School until a
new school is constructed in Half Moon Bay in 2015;
The OCDSB owns a secondary school site in Riverside South and, with a new bridge
under construction that would link Riverside South and Barrhaven, it may be possible
to direct some Barrhaven secondary school students to Riverside South when a new
secondary school is constructed in that community;
Staff is recommending that transportation be provided to and from existing childcare
locations for those students whose existing childcare arrangement will no longer be
irect
result of proposed boundary changes until new childcare arrangements are made or
until June 2013;
The former Parkwood Hills Public School is unable to accommodate Full-Day
Kindergarten; and
Reconfirming a new elementary school in Half Moon Bay as a capital priority
reflects the desire of the working group to continue to stress the requirement for
capital funding.
Moved in amendment by Trustee Scott,
boundary for John McCrae Secondary School to be the same as that for Cedarview
Speaking in support of her amendment, Trustee Scott submitted that elementary and middle
school students residing on Lockmaster Crescent and the north side of Bankfield Road currently attend
Manotick Public School and Rideau Valley Middle School and consider themselves to be part of the
Manotick community. Noting that parents in this area have previously inquired about the possibility of
having their children attend South Carleton High School, she contended that these students should be
permitted to remain with their cohort and attend South Carleton High School rather than continue to be
directed to John McCrae Secondary School in Barrhaven.
In response to queries, Manager Ostafichuk confirmed that most high school students residing in
Manotick are directed to South Carleton High School. At the present time there are approximately six to
eight students, none of whom are currently attending John McCrae Secondary School, residing in this
small, predominantly rural area.
Moved in sub-amendment by Trustee Campbell,
Secondary School attendance boundary area south of Barnsdale Road and east of Prince
of Wales Drive an option area between John McCrae Secondary School and South
Carleton High School.
Trustee Campbell noted that, because consultation with potentially affected residents in the area
has not taken place and residents may be anticipating attending John McCrae Secondary School,
providing an option to attend either secondary school would permit them to follow their cohort to South
Carleton High School if they wished to do so.
Special Committee of the Whole (Public) - 6 - 05 December 2011
New Chapman Mills/South Nepean Area Review
In response to a query from Trustee Shea regarding the potential for increased transportation costs
if some students opted for South Carleton High School while others in the area opted for John McCrae
Secondary School, Manager Ostafichuk advised that the status quo provides busing from the area to John
McCrae Secondary School, and existing yellow school buses travelling from Manotick to South Carleton
High School could accommodate additional students from this area.
Moved in sub-amendment by Trustee Campbell,
hn McCrae
Secondary School attendance boundary area south of Barnsdale Road and east of Prince
of Wales Drive an option area between John McCrae Secondary School and South
- Carried
In response to queries, Manager Ostafichuk advised that staff plans to present a report in the
spring seeking approval for minor boundary changes to deal with growth. She added that these boundary
amendments do not typically impact current students and consultation is either not required, or very
minimal on a site-by-site basis.
Trustee Scott reiterated the desire to allow cohorts to stay together wherever possible, particularly
if they have been together since Kindergarten to Grade 8. Given the potentially low number of students
who would be impacted, and the concerns about overcrowding at John McCrae Secondary School, she
submitted that any redirection to South Carleton High School would be helpful.
Moved in amendment by Trustee Scott,
he John McCrae Secondary
School attendance boundary area south of Barnsdale Road and east of Prince of Wales
Drive an option area between John McCrae Secondary School and South Carleton High
- Carried
Some trustees expressed concern about Part K of the motion, to make an addition to Longfields-
Davidson Heights Secondary School a capital priority, without having an opportunity to review the
or to consider other options.
In response to queries, Manager Ostafichuk advised that an addition to Longfields-Davidson
Heights Secondary School was planned for, and incorporated into, the original design and site plan but
not constructed at the time due to funding constraints. The addition of 12 classrooms is expected to cost
approximately $5 million and a business case for capital priorities has not yet been submitted to the
Ministry of Education. Submitting a business case for the LDHSS addition at this time would not impact
business cases already submitted for other capital priorities, but it would identify this project as one that
needs to go forward sooner rather than later. There are currently 10 portables at LDHSS and the site plan
allows for 24 portables in total. It may be possible to submit a site plan control application to permit
additional portables.
Special Committee of the Whole (Public) - 7 - 05 December 2011
New Chapman Mills/South Nepean Area Review
Moved in amendment by Trustee Seward,
THAT consideration be given to
Longfields-Davidson Heights Secondary School as a capital priority in the context of a
review of the overall capital priorities already submitted to the province at the next
regular Board meeting.
In response to a request from the Chair for staff comment, Director Adams advised that it would
not be possible for staff to present a comprehensive capital plan in time for a review at the next Board
meeting. Manager Ostafichuk advised that including LDHSS as a capital priority at this time would
signal to the Ministry of Education that a resolution to urgent overcrowding problems in Barrhaven
hinges on an addition to LDHSS and a new elementary school in Half Moon Bay. Approval of Part K of
the motion would authorize staff to prepare a business case for the addition to LDHSS.
With the consent of the Committee, Trustee Seward withdrew her amendment.
Staff responded to a number of trustee queries and the following points were noted:
The Ministry of Education considers capital priorities on a year-to-year basis, and not by
school board priority rankings;
Adding the extension of LDHSS as a capital priority would not displace another OCDSB
priority project but rather signal it as an additional urgently-needed facility;
Staff considers an addition to LDHSS to be a prudent long-term accommodation solution;
Portables would still be required at LDHSS t
The comprehensive capital priorities plan would not be ready for review until March or April
of 2012; and
Capital funding for the new Chapman Mills elementary school includes an allocation for Full-
Day Kindergarten space. Staff is recommending the examination of the feasibility of
introducing FDK in September 2013, one year earlier than currently scheduled, and in the
context of the overall cost of FDK implementation at other sites.
Moved in amendment by Trustee Campbell,
-Davidson Heights
Secondary School be discussed in the 2011-2012 consideration of OCDSB capital
Trustee Campbell expressed the opinion that waiting until March or April 2012 for a
comprehensive review and discussion of the Boards capital priorities would not significantly impact the
short-term resolution to school accommodation problems in Barrhaven.
Committee members speaking in favour of the amendment expressed the following opinions:
It is not anticipated that the province would provide capital funding for any projects other
than Full-Day Kindergarten implementation;
It is possible that an addition to LDHSS would displace or bump previously identified capital
priorities; and
None of the other parts of the recommendation hinge on the building of an addition to
LDHSS.
Committee members opposed to the amendment expressed the following opinions:
The working group, members of the public and staff have spent six to eight months working
on scenarios to address enrolment pressures in Barrhaven;
Special Committee of the Whole (Public) - 8 - 05 December 2011
New Chapman Mills/South Nepean Area Review
Staff has advised that an addition to LDHSS is required to solve some of the accommodation
problems;
Because these accommodation problems did not exist five years ago and an addition to
LDHSS was not identified as a capital priority at that time does not mean that it should be
ignored now;
Adding an LDHSS addition as a capital priority identifies the urgent need for provincial
funding to address accommodation problems without displacing a previously identified
capital priority;
Adding an LDHSS addition as a capital priority would be similar to approving additions to
schools in the Glebe/Centretown/Old Ottawa South and/or Kanata; and
s required, but it should not
hold up this particular project.
In wrap-up, Trustee Campbell acknowledged that the Barrhaven area is growing and in dire need
of capital funding; however, he expressed reservations about increasing the capacity of LDHSS to 1,700
students. He expressed the opinion that provincial budget difficulties are likely to continue for several
years and the Board should be cautious about identifying additional capital priorities without having had
an opportunity to review and discuss all of its capital priorities. He submitted that a delay of a few
months to allow a comprehensive review to take place would not be problematic.
Moved in amendment by Trustee Campbell,
-Davidson Heights
Secondary School be discussed in the 2011-2012 consideration of OCDSB capital
- Defeated
Trustee Seward urged the Committee to approve all parts of the recommendation.
In response to a query from Trustee Fisher, Manager Ostafichuk advised that staff considered the
option of allowing Junior and Senior Kindergarten students residing in Stonebridge East to remain at
Barrhaven Public School until September 2013; however, this option would require at least a couple of
additional portables at both Farley Mowat Public School and Barrhaven Public School, which already
have 19 and 17 portables respectively. She noted that the benefits of organizing the new Chapman Mills
elementary school at Parkwood Hills in September 2012 with the inclusion of kindergarten students,
outweigh the disruption of a mid-year move.
In wrap-up, Trustee Blackburn thanked all trustees for a fulsome discussion and urged them to
support all parts of the recommendation.
At the request of Trustee McKenzie, separate votes were held on Part K and Part M of the
motion.
Moved by Trustee Blackburn,
A. THAT attendance boundaries and programs for the new Chapman Mills
elementary school be approved as per Appendix 5 of Report No. 11-189,
with the school formed in September 2012 with a JK to 4 grade structure,
advancing to JK to 5 for September 2013.
Special Committee of the Whole (Public) - 9 - 05 December 2011
New Chapman Mills/South Nepean Area Review
B. THAT effective September 2012, the new Chapman Mills elementary school
be accommodated temporarily at the former Parkwood Hills Public School
site on Tiverton Drive until the new Chapman Mills elementary school
building is completed.
C. THAT the grade structures at Barrhaven Public School and Cedarview
Middle School temporarily become JK-4 and 5-8 for the school years 2012-
2013, 2013-2014, and 2014-2015.
D. THAT revised attendance boundaries for Barrhaven Public School, Farley
Mowat Public School, Jockvale Elementary School, Mary Honeywell
Elementary School and Cedarview Middle School be approved as per
Appendix 6 of Report No. 11-189, effective September 2012.
E. THAT revised attendance boundaries for John McCrae Secondary School
and Longfields-Davidson Heights Secondary School be approved as per
Appendix 7 of Report No. 11-189, subject to making the John McCrae
Secondary School attendance boundary area south of Barnsdale Road and
east of Prince of Wales Drive an option area between John McCrae
Secondary School and South Carleton High School.
F. THAT current Barrhaven Public School JK to 3 students (2011-2012)
residing in the Half Moon Bay boundary area remain at Barrhaven Public
School and that their siblings be given a one-time option to choose to attend
that school.
G. THAT current Barrhaven Public School JK to 3 students (2011-2012)
residing in the Barrhaven Mews boundary area remain at Barrhaven Public
School and that their siblings be given a one-time option to choose to attend
that school.
H. THAT current Barrhaven Public School grade 4 students (2011-2012)
residing in the Half Moon Bay, Barrhaven Mews, Stonebridge East, and
Hearts Desire boundary areas be directed to Cedarview Middle School for
grade 5.
I. THAT preferred busing be provided to those students attending the new
Chapman Mills elementary school while it is temporarily accommodated at
the former Parkwood Hills Public School site on Tiverton Drive.
J. THAT busing be provided to and from existing childcare locations for those
students whose existing childcare arrangement will no longer be within their
ndary changes, until such time as a new
childcare arrangement is made for that student within their designated
school attendance boundary or until the end of the 2012-2013 school year.
Special Committee of the Whole (Public) - 10 - 05 December 2011
New Chapman Mills/South Nepean Area Review
L. THAT a new elementary school in the Half Moon Bay portion of South
Nepean be reconfirmed as a capital priority in order to ensure that funding
is provided in a fashion which would permit a 2015 planned opening.
- Carried
K. THAT an addition to Longfields-Davidson Heights Secondary School be
made a capital priority and that preliminary design and site work be
commenced.
- Carried
M. THAT staff examine the feasibility of introducing the Full-Day
Kindergarten program at the new Chapman Mills elementary school for
September 2013, one year earlier than currently scheduled.
- Carried
6. New Business
There was no new business.
7. Adjournment
The meeting adjourned at 10:03 p.m.
Jennifer Adams Bronwyn Funiciello, Chair,
Director of Education and Committee of the Whole (Public)
Secretary of the Board
Special Committee of the Whole (Public) - 11 - 05 December 2011
New Chapman Mills/South Nepean Area Review