SUMMARY OF DELEGATION FROM "OUR SCHOOLS, OUR COMMUNITIES" Sept. 28
The problem facing trustees regarding school closures originates with the
Ministry, not local conditions. The real problem is Provincial underfunding
of new school construction and of classroom spending.
OSOC urges the Board not to implement the staff recommendations, and not to
finalize decisions about school closures inside the Greenbelt this soon.
Nine is too many and October is too soon.
The number of schools to be closed and the reasons for closing them keep
changing. Two years ago the target was the closure of about 25 schools in
order to attain 100% utilization. Then 100% was replaced by 90% within the
Greenbelt. Then the ministry changed its capacity ratings and 100% was
attainable again. By June the number of closures was down to 12 to 14, twice
what was needed to surpass 100% utilization Board -wide, because now closures
were being driven by a desire to reduce operating costs. Trustees should not
think that these closures will solve the Board's maintenance backlog or
funding shortfall.
How good is the information Trustees have been given? While staff have made
some improvements in demographic projections, there is still much cause for
concern. There have been some noticeable discrepancies between staff
projections for enrolment this year and actual enrolment levels - by about
one whole school. Repeatedly reported increases in expected population, are
not reflected in the staffs current demographic projections. The Regional
Chair and other municipal politicians, based on the advice of their planning
staff have urged the Board to delay closure decisions until they can be
made with the guidance of new demographic studies to be released in a few
months.
How many schools should be closed. School closures should be minimized. We
don't need to close 9 schools to surpass 100% utilization.
Is the staff recommendation complete? Much work remains regarding program
placement and boundary adjustments. French Immersion and Alternative English
programs displaced from schools recommended for closure have been
redistributed in a way that in some cases threatens their viability. Further
changes to boundaries and program locations will have to be made if
equitable access to programs is to be preserved. A complete plan requires more
attention to these matters than there was time before August. To avoid future
disruption, all of these changes should be made only when a complete
plan is ready
The question is, how good a conclusion can trustees reach given the state of
the process to date? The staff report was riddled with production errors.
This is an indication of the terrible time pressure staff were under. How
badly did the rush affect the quality of recommendations? The recommendations
for the East family, formerly known as Quadrant C, show a much closer
conjunction between staff recommendations, community input and trustee
policy than many of the other families. The extra time and resources spent
in that one family have produced a much better result. Surely better results
could be achieved in the rest of the families if they were given equal
treatment. That is not to say the recommendations for East family are
perfect. There are still problems with boundaries and program placement,
and people would be happier to have fewer schools closed.
Fewer schools should be closed, and a delay is needed to properly complete the plan.