HomeMy WebLinkAbout04b3 Delegation Anne Scotton and June Creelman re Glebe Community09/21/2000 14:54 5132327925 CREELMAN CHENEY PAGE 02
MO
Special Board Hearings on School Closures
Presentation by Glebe Community
Association
September 20, 2000
Contact: Anne Scotton
231 -2778
03/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 03
GCA 2
1.0 Summary of Main Points
The GCA has contracted an Independent demographic analysis of
population and projections. Besides the projections used by the board,
three other sources of data for our area were examined. Even in the
short time allowed for public comment, this analysis has revealed
inconsistencies and raised questions about the accuracy of any current
demographic projections.
Therefore, the GCA recommends that the OCDSB nv base its
closure decisions on population projections as outlined in the May
26, 2000 scenario report. More time is needed to conduct a proper
demographic analysis of the region inside the Greenbelt.
Public consultation has been inadequate. More time must be allotted to
communities and individuals so that they can understand fully the
Implications of decisions being made in their communities.
The structure of the public input process makes it difficult for members
of the public who are not already involved on school councils to know
what is happening or be able to participate. It would appear little effort
has been made by the OCDSB to inform the public at large about the
process, the proposed scenarios, or their potential effects.
The GCA expects that decisions will only be made following a process
that is fair and considers views from all segments of the community.
The fact that the board has not acknowledged our written concerns and
has done nothing to improve its consultation process does not meet the
minimum test of procedural fairness.
For this reason, the GCA recom ends that the public consultation
period be extended and that additional opportunity for public
presentations and discussion be provided in September and
October.
School closure decisions must be delayed until the new City of Ottawa
is created in order to allow all levels of local government to participate
in a meaningful way. Motions to this effect have been passed by the
current council of the City of Ottawa, and the Regional Municipality of
Ottawa Carleton. A functioning municipal administration will be key to
assisting the Ottawa Carleton District School Board in its continuing
efforts to have the provincial government alter Its funding formula and
method of determining school capacity.
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 04
GCA 3
• The report does not adequately take into account the impact of potential
decisions on the students Involved, nor the communities which depend
on the schools in question.
• The report does not adequately consider the long term Impact of school
closures on communities, such as the Glebe.
• The report does not adequately consider recent population shifts due to
the rapidly expanding high technology sector in our community as a
whole, and there is no analysis of the specific effects of this
demographic shift on either the "Central Family" region.
• The GCA is concerned that turning the First Avenue into dual stream
school (English and French immersion) will eliminate one of the last
dedicated Early French Immersion facilities in the region.
The cwestion must be asked: As part of its program review has the
OCDSB decided to eliminate or phase out Early French Immersion?
Ottawa Carleton is in the vanauard of French„ mmerslon nrogramming
in Canada. Has that commitment changed?
Given its long - standing support for the maintenance and preservation of
heritage properties, especially public heritage properties, the GCA
would like the OCDSB to provide it with information on the how the
facility ratings were carried out, what criteria were used in evaluating
the costs of keeping these structures open versus closing them, and
which heritage specialists were consulted.
The GCA Is concerned that the current scenarios compromise the safety
of the students who will be squeezed into First Avenue Public School
should Mutchmor close. The association feels the precautionary
principle should guide decision making when it comes to issues of
health and safety. The community will not accept an unsafe situation
created at First Avenue through overcrowding and will closely
scrutinize all zoning bylaws, safety regulations and other legal
requirements to ensure they are rigorously applied and adhered to.
i
09/21/2090 14:54 6132327826 CREELMAN CHENE`/ PAGE 05
GCA4
2.0 Introduction
The Glebe Community Association (GCA) represents approximately 4,000
residents of the region of the current City of Ottawa know as the Glebe. Families
move to our area for many reasons. What they find in the Glebe, as in many
adjacent downtown neighbourhoods, is a sense of community and history. A key
part of that history are First Avenue and Mutchmor Public Schools. In this
respect, the Glebe is like many other neighbourhoods that the Ottawa Carleton
District School Board has congregated into the "Central Family of Schools "'.
People choose to live in an urban environment for the amenities it offers. For
many residents, this means having schools close by that are integral parts of the
daily life of the communities they serve.
Process and politics are intermingled in these scenarios. On the one hand, the
OCDSB is being forced to dose schools because of a provincial government
funding model and space allocation formula that do not take into consideration
the needs of real students in actual schools. For the province, this is just a
numbers game and school Closures are part of the pressure being placed on the
public education system which, like other key public services in our province, is
being remodeled, downsized and, in many cases, sold off to the highest bidder.
The GCA agrees with the members of the Central Family of Schools group that
also assessed the board's scenarios. We support that report's recommended
alternative scenario:
The Central Family of Schools recommends that the OCDSB
engage the community (including, but not limited to school councils)
in a meaningful exercise, supported by adequate time and
resources, to address the serious pressure being put on the
OCDSB to close school facilities inside the Greenbelt. We are
confident that this alternate process scenario would enable the
considerable expertise among Board staff, parents, school councils
and community organizations and governments to be channeled
effectively toward developing the education programming and
facilities that will best meet the needs of our community.2
The following comment and analysis is offered by the GCA in an attempt to
outline key community concerns.
' Cambridge Street, Centennial PS, Elgin Street PS, First Avenue PS, Glashan PS, Hopewell PS,
Lady Evelyn Alternative School, Mutchmor PS, Viscount Alexander PS, York Street PS.
Response to 0CDS8 Report No. 00-137 submitted by the Central Family of Schools, June 26,
2000, p. 25.
03/21/2000 14:54 6132327626 CPEELMAN CHENEY PAGE / 06
6
GCA 5
3.0 Demographic Changes In the Central Family
One of the criteria that is supposed to guide the OCDSB's school closure process
stipulates that the board "obtain and review the best available data. "' Our
preliminary analysis has raised questions about whether the board has either the
best data or the best model, and how thoroughly it has examined other models.
That's because there are at least three other sets of data available, each showing
different projections, all of which assume higher levels of growth than the board
is assuming.
In any school closure issue, one of the fundamental aspects is the growth of the
school -aged population, in this case the age group 5 -14. The other critical
decision- making aspect is how long is the planning horizon? If it is too short,
there is a risk of dosing schools too soon, only to find need of one or more
schools in a neighbourhood to accommodate unforeseen growth. If the planning
horizon is too long, then the assumptions underlying the projection model may
get outdated as time passes by, and one risks poor decisions in that scenario.
"If we don't believe It and we don't plan for it, we are going to
choke off that growth within the next three or four years ... You
won't be able to get down the Queensway. You won't be able
to land at the airport. You won't find office space or a place to
send your kids to school."
Rod Bryden
Chairman, SC Stormont Corporation
Toronto Star, June 3, 2000
(emphasis added)
What is absolut Iv essential is the transparency of the proiection methodology
used by the School Board in arriving at its projections These have not been
forthcoming in the timeframe that we have had to review board plans and
options.4 Nevertheless, there are a number of issues which can be considered
immediately, and which should influence the board's decision - making process.
3 Report No. 98 -291 to the Board CRITERIA AND VARIABLES USED TO ASSIST IN
DEVELOPING AND EVALUATING OPTIONS IN THE AREA REVIEW /SCHOOL CLOSURE
STUDY 14 September 1998.
Following a request to the Director of Education, Jim Grieve, the GCA received a copy of a June
5, 2000 memorandum from Superintendent Rose -Marie Batley entitled "Outside Opinions
Regarding Enrolment projection Methodologies Used by OCDSB Stafr'. While this memo
discusses the boards general approach, there is no substantive discussion of methodologies or
how assumptions were applied in particular scenarios. Further Information on board projections is
found at
hW ://www.ocdsb.edu.on ca /General Info/Ares R @view /Greenbelt/QandA/General Questions htm.
09/21/2000 14:54
Ell
6132327825
GCA 6
2. 1 The difference between projections
CREELMAN CHENEY
Given recent public comment concerning projected population growth in Ottawa
over the next 20 years, we have sought other sources of data for the purposes of
comparative analysis.
There are three different scenarios or projections which have a bearing on the
Central Family area. These come from the City of Ottawa, the Regional
Municipality of Ottawa Carleton, and the private firm CompuSearch. Although
they differ, these data force us to question the Board's projections. And, failing to
receive requested information on underlying assumptions for the projections in
the Central Family area, we are forced to question their forecasts.
More work needs to be done on the methodologies and assumptions behind
these projections, but the results are interesting and contradict the projections
used by the board.
2.2 What is the correct planning horizon?
The OCDSB planning horizon is just 5 years, i.e. to 200412005. This begs the
question, is it too short based on the other longer -term projections? At this point
in the analysis, we must employ the precautionary principle and state that,
without proof to the contrary, the answer is'Yes ".5
Current projections from the City of Ottawa show a huge increase in the number
of children ages 5-14 after 2001, hitting 5,513 by 2006 and 7,203 by 2011. A
second set of projections done by the company, CompuSearch, shows
essentially the same trend with a high of 4,951 in 2008. Regional Municipality of
Ottawa - Carleton (RMOC) data show a much higher base population for the
Central area to start with and rising steadily to 2006.6 The RMOC trend line is
However, while the methodology outlined may or may not be appropriate, much more careful
attention needs to be placed on the age and household composition and their rates of expected
mobility out of their single family houses. If there is a large proportion of such households, it
means the neighbourhood will see an in- migration of younger families with children — as long as
there are schools for them to go to.
3 This is not the first time an Ottawa board has used too short a timeframe for a planning horizon.
In 1985 the then Ottawa Board planned to close Fisher Park High School. The planning horizon
to 1990 failed to pick up a major growth to the high school population base in the catchment area
for Fisher Park, given the neighbourhood family cycle of older /empty - nester families moving out
and new younger families moving in. Acquiring the same date from the board's data source,
which was the then Family Allowance Act data, allowed for a projection of a longer time frame
than the board had used and showed quite clearly that the area was going to experience a boom
in the 14-18 age group after 1990. The Board decided to lease out the school for a few years and
then bring it back on stream to become a Grade 7-8 school to take some of the pressure of the
elementary and high schools in the area.
s _
Note, we have not had the time to explore why the RMOC base year data for the 5 -14 year olds
is 30 much higher. It could be a difference in geographic boundaries.
PAGE 07
IE
06/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 08
GCA 7
shows a steady increase, and no decline until 2011, albeit with slower growth
than the other two projection sources do. But, even its projected lower
population by 2011 is still comparable to the CompuSerach projection's high in
2008 (see Chart 1).
"We know the overall growth in jobs is exponential."
Bob Chlarelli
Chair, Regional Municipality
of Ottawa- Carleton
Toronto Star, June 3, 2000
(emphasis added)
Finally the board's projection for the Central family of schools looks like a simple
straight -line extrapolation to 2004/05. We, of course, don't know the specific
assumptions that were used to arrive at this projection for the Central area.
However, it appears to fly in the face of the other three projection trends for the
5 -14 age group. The GCA will continue to work on its analysis over the next
couple of months and will submit additional information to the board at a later
date.
While we do not yet have all the assumptions behind the three additional
projections, this much we do know:
Employment levels in advanced technology are rising rapidly. For example,
total growth in advanced technology since 1993 has been 109 %. In 1997 -98 it
was 9 %; in 1998 -99 it grew to 16 %. This year 16% growth is expected at least
and may be underestimated. In 1990 there were 300 advanced technology
companies in Ottawa -- today there are over a 1,000. 1
Should we assume that all this growth will head to the suburbs? Such an
assumption cannot be supported. According to a CMHC "Forecast Summary"
on the "New Homes Market" for Ottawa for Spring 2000,
"The western suburbs of Kanata and Nepean are still home to most
of the new construction but Gloucester and Cumberland in the east
Further details can be found at http• //www.ottawareoion com /ottawafacts. With the release of
the report of its Economic Generators Initiative, the Ottawa Partnership (TOP) envisioned a
"remarkable opportunity" for Ottawa to build a "prosperous, self - fuelling new economy based on
investment entrepreneurship and innovation." TOP materials project compound annual growth in
high technology employment in the range of 6.5°x, implying a doubling time of 9.3 years — and a
quadrupling, if the trend holds, within 18.6 years. Senior municipal and business leaders expect
this to translate into a doubling of Ottawa's population In the next 10 to 20 years.
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 09
GCA8
will be closing the gap. Intensification will also continue in the city ,
centre, spurred by renewed interest In urban living."
Many high tech migrants will choose the amenities of an urban lifestyle.
Abetting this shift is Ottawa- Carleton's east -west transportation artery, the
Queensway, as well as efficient public transportation. Both allow rapid
commuting time from the centre to the West or East where the high tech
companies tend to locate for now.
• As the "babyboomA generation residing in the Central area retires, they will
likely sell their single detached and other family -type houses and young
families will move in. This trend has been observed in other parts of Ottawa,
including the Fisher Park highschool area over the 1980s.
• Even the Board's own historical data on enrolment in the Central Family area
show an historical increase over time. Yes, these figures cycle up and down,
but notice that even the low point in the recent cycle, for which we have data,
is higher than any levels prior to 1 991 — (see Chart 2).
2.3 What demographic conclusions can be drawn at this stage?
The OCDSB's projection appears to run counter in the short term with the
RMOC's and especially with the City of Ottawa's projections over a longer
planning horizon to 2011. Exact comparisons will be difficult unless the board
provides more detail on its exact methodology for projecting each of its district's
enrolment and provides its rationale for the assumptions used for each district,
including why its projections run counter to other regional and local government
projections. The GCA cannot stress too strongly that, without this information,
there is little or no chance that the public input process can be construed as fair
and transparent.
The GCA believes it is incumbent upon the OCDSB, a democratically
elected and accountable body, to provide the public with this information.
3.0 Comments on Scenarios
This section will focus on the scenario effects on the two schools in our
immediate area -- Mutchmor and First Avenue -- as well as their effects on the
community. It is important to note that all five scenarios for the Central Family
region have negative effects on both of these schools and the community as a
whole. For detail, see the impact analyses attached to the Central Family of
Schools report.
It is also important to note that Mutchmor is the city's oldest public school and in
late June celebrated 105 years as an integral part of the Glebe community.
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 10
6 ?.
GCA 9
Heritage status has been accorded by the City of Ottawa, something which the
GCA has supported. In 1999, First Avenue was also given heritage status by the
city.
Given its long- standing support for the maintenance and preservation of heritage
properties, especially public heritage properties, the GCA would like the OCDSB
to provide it with information on the how the facility ratings were carried out, what
criteria were used in evaluating the costs of keeping these structures open
versus closing them, and which heritage specialists were consulted.
3.1 Effects on Mutchmor Public School
Impacts on English /Core French and Special Education Students
• In all staff scenarios, the 180 regular English and special education students
at Mutchmor would be redirected to First Avenue Public School.
First Avenue does not have space to accommodate the regular English and
special education students who currently attend Mutchmor. Since First
Avenue has one of the smallest yards of any OCDSB school, it is unlikely that
the school could safely or reasonably accommodate the number of portables
that a combined population would require. In fact, the First Avenue school
council has consulted with the fire marshall, who indicates that portables
cannot safely be placed in the school's junior yard.
The space shortage that would result from closing Mutchmor becomes even
more urgent in light of the substantial increase in enrolment that is taking
shape in the Mutchmor /First Avenue attendance area.
• Students in Mutchmor's English /core French program would suddenly find
themselves in a rather confusing environment, with both the English and
French immersion programs struggling to maintain continuity in a dual track
school.
Program quality and accessibility would also be a serious concern for special
education students currently attending Mutchmor. Severe space limitations
would make it more difficult for school staff to find creative ways of delivering
the programs and services that students require, within the limits of the
Board's new special education delivery model. As well, identification of
students with special learning needs would be slowed down in a larger, more
complex school environment, thereby eliminating one of the most important
advantages of a relatively small, English -track primary program.
A combined school would also raise serious concerns related to traffic
congestion, safety, and environmental impact. A large proportion of Mutchmor
students live on the west side of Bank St. — a busy, often dangerous
09/21/2000 14:54 5132327825 CREELMAN CHENEY PAGE 11
10- GCA 10
thoroughfare that is seen as a natural dividing point between the two halves
of the Glebe. Mutchmor students transferred to First Avenue would not qualify
for busing based on distance, but many of them would no longer be able to
walk to school, as they do now. The resulting congestion would aggravate
traffic problems that have already raised safety concerns at First Avenue.
Impacts on Students in the Gifted Program
• In all staff scenarios, gifted students at Mutchmor would be redirected to
Hopewell Public School.
When the Board decided to close McNabb Park PS and three other
elementary schools as of September, 1999, the affected families were
repeatedly assured that OCDSB staff would do their best to prevent any
student from being moved more than once. The GCA feels this position is
now being negated by all five Central Family scenarios.
Transportation to Hopewell PS will raise the same traffic safety concerns that
we have identified for regular English and special education students
redirected to First Avenue. Here, the issue is not so much an incremental
increase in overall traffic volume or associated environmental impact, since a
large proportion of students in the gifted program are already bussed or
driven to Mutchmor. However, Hopewell is located at the very busy
intersection of Bank St. and Sunnyside Ave., and is already experiencing
serious safety challenges that will only be aggravated with a larger student
population.
• Parents in Mutchmor's gifted program are also concemed that it will be much
more difficult to maintain program continuity in a very large elementary
school with more than 900 students.
3.2 Effects on First Avenue Public School
The GCA is concerned that turning the First Avenue into dual stream school
will eliminate one of the last dedicated Early French Immersion facilities in the
region. The question must be asked: In its review of programs has the
OCDSB decided to eliminate or phase out Early French Immersion. Our
association considers this auestion to be of paramount importance and
demands full public discussion of this option before it is implemented
There are not enough classrooms in First Avenue to accommodate
Mutchmor's English language students. This would require portables in the
junior yard at the school, something which the Ottawa Fire Marshall's office
has said would be difficult to achieve given the need for safe evacuation
space. As well, portables would have to be 15 metres (50 feet) from the
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 12
GCA 11 X/
building for safety reasons and to provide access for emergency vehicles.
Failure to follow fire regulations would also leave the OCDSB open to
litigation based on the lack of consideration of health and safety protocols.
The GCA feels the precautionary principle should be employed in this case.
The community will not accept an unsafe situation created at First Avenue
through overcrowding and will closely scrutinize all zoning bylaws, safety
regulations and other legal requirements to ensure they are rigorously applied
and adhered to.
A further safety concern lies in the configuration of the First Avenue
playground, which consists of two areas: an area for X to grade 3 students
and a second space for grades 4-6. There is one play structure located on
each side. An asphalt surface runs throughout with little provision for shade.
Once again, there is a concern about the effects of overcrowding.
The GCA also requests that the board conduct an analysis to determine the
effects of increased bussing and car use in the First Avenue, O'Connor Street
and Glebe Avenue vicinity.
3.3 Other community effects of the proposed scenarios
The City of Ottawa has passed a motion calling on the OCDSB to delay its
closure decisions. As part of the background information to that motion, city staff
prepared a report on the effects of closure scenarios outlined in the board's May
26th report.$
The city report has identified a number of effects that would be created by the
closure of Mutchmor. These include:
Impacts on the programs offered by the Glebe Community Centre (GCC),
which uses the school's gym four nights a week, for an average of three hours
per night for children's and adult's programming, as well as a youth drop -in.
Closure would also affect the GCC's after school and school break programs
given that approximately 40% of participants in these programs are from
Mutchmor. Almost all of the children in the centre's breakfast club are also
from Mutchmor.
It is worth noting that, should English language students be moved to First
Avenue, there will be no space to accommodate any of the GCC programs.
3.4 Further considerations with respect to growth
City of Ottawa, School Closure and Service Delivery Options — Ottawa Carleton District
School Board. Community Services and Operations Committee (Agenda 11A -June 14, 2000).
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 13
/ CK GCA 12
The June, 2000 edition of REM, a newspaper produced for local realtors,
speculated on the °beginning of a suburban exodus ", suggesting that "trends
point to less interest in suburban living ". The article puts an economic twist on
anecdotal evidence of a red -hot real estate market in downtown neighbourhoods,
noting that the average price of a two -story dwelling in the Glebe increased 30%
between 1995 and 2000, compared to 12% for a similar home in Kanata. Sherry
Chris, Vice- President of Real Estate Services for Royal LePage, cites three
consumer groups that are showing greater interest in downtown living: early -
retiring baby boomers, first -time home buyers, and people who work at home.
The last two categories can both be taken as proxies for families with school -age
children. "Not for the last time, real estate is providing an early indicator of a
dramatic social shift," the newspaper stated.
The REM article was based in part on a forthcoming national survey by Royal
LePage Real Estate Services, which was summarized in a media package that
the company released April 3. Area Manager Pierre de Varennes reported "a
greater demand for urban dwellings over suburban homes ". And while the
summary indicated that "mature third- and fourth -time buyers dominate activity,"
it identified first -time buyers as one of the key groups moving downtown. "As
witnessed in last year's early spring market, multiple offers continue to be
commonplace and peppered by some bidding situations, as demand continues to
outpace supply," de Varennes said. "Overall, homes have short selling periods
averaging about 49 days compared to 90 days in more balanced market
conditions."
While the trend toward urban intensification is relatively new, it is by no means
restricted to Ottawa. In a recent speech to the American Institute of Architects,
cited in the REM article, U.S. Vice- President Al Gore commented that "the sprawl
that has developed around our cities has transformed easy suburbs into lonely
cul -de -sacs, so distant from commercial centres that if a family wants an
affordable house, a commuting parent often gets home too late to read a child a
bedtime story". Royal LePage's Sherry Chris commented that first -time buyers
"are getting good jobs that pay well... interest rates are low, so they are able to
buy their first home earlier than was traditional, and they want to be in the
downtown core because it's cool ".
Similar reports appeared in the May 15 edition of Canadian Business, and a
recent issue of The Economist.
These reports cast serious
doubt on
the assumption
that urban
areas — in
Ottawa, or elsewhere — will
gradually
lose population
and elementary school
enrolment to the suburbs. A
more complex
picture calls
for more careful
study,
particularly because the Board will find it
difficult and expensive
to reacquire
land
and rebuild schools that may
be needed to serve a newly-
- intensifvina
downtown
Population. IJ
03/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 14?
GCA 13 �01
4.0 GCA Concerns with the Review Process
The GCA recognizes that the Ottawa Carleton District School Board is being
forced to cut its budget and close schools as a result of cutbacks and the
Government of Ontario's inability to understand the needs of our community.
These are political issues which affect all educational decision - making, and
which the GCA has, and will continue to, take up with the provincial government.
Because of the highly charged political nature of education and the increasing
damage that cutbacks are having on one of the country's finest public education
systems, the GCA has serious concerns with the process being used to
determine which schools should be closed inside the Greenbelt. Our general
concern is with the formula the provincial government uses to determine "100%
capacity ". This formula is plainly unworkable and should be scrapped. The GCA
recognizes that the OCDSB has attempted to get the federal government to
change the formula and points to the fact that the Ottawa Carleton Assembly of
School Councils has also called for the formula to be reduced to 90 %. The GCA
further notes that the OCDSB "target" for inside the Greenbelt is also 90 %.
Nevertheless, we argue that even this figure does not take properly into account
the design of older schools, and ignores the use of space in these structures.
The GCA has written to both the board and the Ministry of Education about these
issues.
However, our specific concerns have to do with the OCSDB's current closure
process. These concerns were outlined in letters to Board Chair Jim Libbey
(June 6, 2000 and June 13, 2000). These letters, which went unanswered,
requested that the OCDSB:
1. Extend the initial community input period by one month (to the end of July);
2. Provide additional opportunity for public comment and discussion of options in
September and October,
3. Delay all closure decisions until the end of November, when Ottawa Carleton
will have a new municipal council in place that will be better placed to deal
with issues related to facilities and other matters;
4. Make sure that closure scenarios are revised to take into account recent
population projects based on exponential growth in the high tech industry:
and
5. Provide the community with the methodology and assumptions the board
used in its population projections.
It is fair to state that none of these requests has been fulfilled, and only the last
has been partly addressed. Following a written request, the Director of Education
provided a copy of a memo ( "Outside Opinions Regarding Enrolment Projection
Methodologies Used by OCDSB Staff) and 1994 policies of the Carleton Board of
Education on enrollment methodology. However, outside opinions, no matter how
09/21/2000 14:54 6132327826 CREELMAN CHENEY PAGE 15
�y GCA 14
reputable the source, and old policy documents with assumptions now nearly a
decade old, are no substitute for the kind of information and detail that was
requested, and which is required to properly assess the assumptions being used
by the board in this process.
The GCA believes that this information should be in the public domain. Until it is,
the process can not be seen to be transparent, fair or above board.
5.0 Conclusion
From this preliminary analysis it is possible to conclude that:
1) there continue to be serious questions about the accuracy of data used by the
board to determine enrollment projections;
2) enrollment and population projections fail to factor in the potential for
explosive growth in the region over the next decade at least;
3) the school closure process, as currently designed, leaves the board open to
charges that it is being unfair, secretive and is trying to rush to a decision
without properly consulting all affected parties;
4) specific scenarios affecting First Avenue and Mutchmor are inadequate and
do not consider the impacts on student learning, health and safety, nor do
they consider the long -term effects on the immediate community; and
5) Turning First Avenue into a dual track school appears to be a backdoor
attempt to kill Early French Immersion.
09/21/2900 14:54 6132327926 CRESLMAN CHENEY PAGE 18
Glebe Community Association-
Community Impacts of Closure of Mutchmor School
THE COMMUNITY WILL SUFFER
Good schools are key to the long -term health of a community. They attract new residents,
ensure a mix of ages, and create community spirit.
Quakty of Life in the Glebe
• The Glebe is !mown for excellent schools which kids can wall; to. Our quality of
life and community atmosphere will decline if we have kids in portables and
increased traffic congestion at First Avenue School.
Decline of the Urban Core
• Without schools, fewer families will move downtown. In the long -term, this
may lead to an American style exodus of families to the suburbs.
WE'LL LOSE VALUABLE PUBLIC ASSETS
If Mutchmor closes, the property will be sold to a developer (unless another school board
or the City takes it). If the Glebe loses these assets, it will be difficult to replace them.
Loss of a Publicly -0wned Building
• We'll lose the school building, completely paid for by Ottawa taxpayers.
• We'll lose our heritage —the oldest public school building in Ottawa
Loss of Green Space
• We'll lose Mutchmor Field, the large park behind Corpus Christi school, since it
belongs to Mutchmor and would be sold with the school building
• Recreational facilities like the skating rink & play structure will be displaced
• The Glebe's open space (amongst the lowest in the region) will be further
reduced
THE DECISION MAKING PROCESS DOESN'T MAKE SENSE
The Glebe Community Association believes that the Board's decision process is flawed.
Outdated Demographic Data
• Ottawa's population is booming right now. New projections will be available in
January; but the Board decides in October which schools to close.
Big Changes since 1995
• Since 1995 (the year the population data is based on) the Glebe has seen a 500%
increase in home sales (source: Jeff Hooper, realtor).
• Since 1995, more than 100 new (infill) residential units have been built in the
Glebe (source: Glebe Community Association)
Questionable Analysis
• The Board's estimate of school capacity in the downtown core includes McNabb
School —even though it is vacant!
Bad Timing
• School closures come at a time when Ottawa is under a Transition Board and
facing municipal elections. Who will voice city concerns? Would the city be in a
position to accept any school properties offered?
A Flawed Formula
• The Province's school funding formula pits downtown communities against the
suburbs. We all agree the suburbs need new schools. But we must question a
formula that penalizes established neighbourhoods.