Loading...
HomeMy WebLinkAbout15 Deferred Motion re Secondary School Closure Processbe presented with an option that aclueves 100% utilisation in accordance with [ne ,Mutsu) Kwucuuca. Staff will develop options consistent with the criteria approved by the Board on 14 September 1999. 10.1 Staff considers a number of variables when developing and comparing options. for closure (attached as Appendix A). These variables reflect the Board's approved criteria and are used to assist in evaluating the most suitable option. If the Board wishes to direct staff to modify or change these variables, staff suggests that a second trustee workshop be scheduled as soon as possible to reach consensus. 11. The new planning software obtained by the Board will facilitate staff's ability to evaluate and provide data regarding various scenarios proposed by members of the SSC. At this time, staff is continuing to explore how data will be shared with members of the SSC. 12. Staff has reviewed the process and timelines for Quadrants A and B in the elementary panel, and the Secondary panel. 12.1 During the Trustee Workshop, concerns were raised that it would be impractical for Trustees to be addressing closure issues in the fall of 2000. Due to the complexity of alternatives to be studied, staff is unable to complete the review prior to this time. 12.2 It is staff's intention to bring forward recommendations for school closures in Quadrants A and B in February 2001, with Trustee decisions in June 2001, for closures to be implemented for the 2002 -2003 school year. The detailed timelines will be similar to those recommended for Quadrant D. A similar review of the elementary schools outside the Greenbelt will be conducted. 12.3 Due to the number of schools, staff will be making recommendations in May 2000, with respect to identifying study areas or groups of schools within Quadrants A and B and the areas outside of the Greenbelt. Staff will be able to proceed with the development of options for each study area after these areas have been approved by Trustees. 13. Staff has considered the timelines for review of the secondary panel. If the proposed timelines ,. for the elementary panel are approved, implementation of secondary school closures should be delayed until September 2003. To allow for effective implementation, decisions about secondary closures will need to be finalized no later than June 2002. 13.1 The impact of Secondary School Reform will need to be taken into account when carrying out the Secondary School Area Review / School Closure Study. Planning will work closely with staff of other departments to ensure that recommendations can be developed consistent with program needs of the Board. 132 For example, significant work needs to be done to develop a vision of which programs are to be provided in system schools, and which should be available at all community schools. These parameters should be approved prior to June 2001 to allow the effective development of alternatives for secondary school closures. In addition, staff will need to look at alternative delivery models for adult education in the event that changes are not made to the funding model, (ie., changes which would provide recognition for the space requirements of the program). 13.3 Once these parameters have been determined staff will bring forward recommendations for revised study areas, which will facilitate community feedback EXCERPT FROM STAFF REPORT 00-050, 21 FEBRUARY 2000 A) That Board approve the following timelines for the School Closure/Area Review process for Quadrant D as follows: 6 March 9 and 23 Orientation for the School Study Committee. March 28 Presentation of Staff preliminary options for closures and/or boundary changes, to the SSC. April 3, 10, 17, 24 The SSC would meet during these weeks to review the staff options and to suggest alternate closures and/or boundary changes. Staff would be available for a weekly meeting. May 2 Receipt of SSC report and comments. May 24 Presentation of staffs recommendations to Committee of the Whole. May 31, June 13 and 15 For $SC response, delegations and Trustee deliberations during Committee of the Whole. July 5 Final Board decision. and that Board approve the timelines for the completion of the Quadrant C review as follows: May g Presentation of follow -up report to Board responding to the options presented by members of the community subsequent to the SSC process. June 20 Delegations and Trustee deliberations in Committee of the Whole. June 26 Final decision by Board on Quadrant C closures. And B) That Board approve the general timelines established for Quadrants A and B and the areas outside the Greenbelt. which include: i) decisions prior to June 2000 with respect to groups of schools and study areas; ii) staff bringing forward recommendations in February 2001; iii) Trustee decisions made in June 2001 for Sept 2002 implementation; and 'k C) That Board approve the general timelines for secondary school closures, which include: i) decisions prior to June 2001 re: parameters to be used in the study process; and ii) decisions no later than June 2002, for implementation September 2003. Jim Grieve Director of Education and Secretary of the Board *, DEFERRED RHCONM ENDATION Rose -Marie Batley Superintendent of Facilities and Physical Planning F]