HomeMy WebLinkAbout13 Report 98-101 Budget Options and Public Survey53,
Ottawa - Carleton District School Board
This report is the original version
March 19, 1998
Report No. 98 -101 to the Board
Re: Budget Options and Public Survey
ORIGINATOR: Michael E. Clarke, Superintendent of Business and Treasurer
PURPOSE:
To provide further information to trustees on the budget options presented at the March 9, 1998 Board Meeting.
To seek trustee approval of a public consultation process.
BACKGROUND:
1. The Board commenced its review of the proposed 1998 -99 budget public consultation process at its March 9,
1998 meeting. At that meeting, trustees asked for changes to budget option sheets and further staff input on
the public consultation process.
2. Trustees have indicated that they wish to consider having a Region -wide random sample telephone survey, as
well as a survey of School Councils, to provide public input to the 1998 -99 budget.
STATUS:
3. Attached as Appendix A are the Budget Change Options, categorized into five broad areas:
A. Potential Changes to Junior Kindergarten
B. Potential Changes to Regular Day School Programs
C. Potential Changes to Special Education
D. Potential Changes to Student Support Programs
E. Potential Changes related to Student Transportation
F. Potential Changes to Other Areas
The Budget Change Options on which Trustees had requested additional information have been revised and are
now included in the package in place of the original pages.
4. Staff were asked to prepare a brief summary of some principles and methodologies for public consultation.
This summary is attached as Appendix B.
5. During the Trustee discussions at the Board meeting, concerns were expressed as to how to frame the questions
to be used for the public consultation, given the diversity of budget options. Staff suggest that Trustees
determine major categories of budget changes for which questions can be tailored, instead of trying to write
a survey covering fifty -six separate areas.
6. If Trustees agree with this approach and set the categories this evening, staff will prepare a set of draft survey
questions for the April 6, 1998 Board meeting. (The proposed revised budget process timetable would provide
(W sufficient time for the survey results to be available before the Board votes the approved budget.)
7. The questions could also be used for a survey of school councils.
....J2
-2-
RECOMMENDATIONS:
A. That the Board approve the six budget option categories for public consultation, as set out above.
B. That the Board direct staff to prepare draft survey questions structured around the specified categories for Board
review at its April 6, 1998 meeting.
Michael E. Clarke,
Superintendent of Business and Treasurer.
Report No. 98 -101 re Budget Options and Public Survey March 23, 1998
BUDGET CHANGE OPTIONS
INDEX
SECTION AREA
A Potential Changes to Junior Kindergarten
B Potential Changes to Regular Day School Programs
C Potential Changes to Special Education
D Potential Changes to Student Support Programs
E Potential Changes related to Transportation
F Potential Changes to Other Areas
6s-
APPENDIX A
66%
SECTION A: POTENTIAL CHANGES TO JUNIOR KINDERGARTEN
9
School Year 1998 -99
School Year 1999 -00
Page
Option
($ Millions)
($ Millions)
A.1
Eliminate Junior Kindergarten Program
3.054
3.054
A.2
Reinstate Junior Kindergarten Program over entire OCDSB
District
7.923
7.923
A.3
Use differentiated Staffing Model (Early Childhood Educators) for
Junior Kindergarten
5.842
5.842
A.4
Offer Full Day / Alternate Day JK Program (assumes delivery of
SK Program is also Full Day / Alternate Day)
6.978
6.978
9
r r r
Ottawa - Carleton District School Board i
BUDGET CHANGE OPTIONS
Option Eliminate JK
Potential Cnst Savin¢
In 1998 -1999 $3.054 Million
Annualized Saving $3.054 Million
Date
Required Investment /Cost to Implement
Staff Impact
Nil.
All JK teachers returned to SK -8 system.
Funding model not yet known. Recent Minister's statements confusing as to whether or not there will be funding.
Increased redundancy in the system.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• No JK throughout district.
• Early literacy and numeracy programs would start in SK.
• Possible educational disadvantage to children at risk, as indicated in JK report.
• Possible loss of registration of students at JK /SK /Grade 1 entry point if the Separate District Board continues to operate the program.
• Realignment of transportation for SK students as there will be fewer students over noon hour.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Funding model not yet known. Recent Minister's statements confusing as to whether or not there will be funding.
Time Required to Implement
Decision Dates /Milestones
June 30,1998
April 30, 1998
Success Evaluation Criteria
$3.054 Million saved.
A.1
LIN
'a
Ottawa - Carleton District School Board �
BUDGET CHANGE OPTIONS
Option Reinstate JK over entire District
Potential Cost Saving
In 1998 -1999 Nil
Annualized Saving ($7,923,000)
Date
Required Investment /Cost to Implement
Staff Impact
$7.923 Million
JK staff would have to be hired to support the program, i.e.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
additional teachers.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Gives all 4 year olds equity of access to the kindergarten program across the District.
• Research indicates that an early educational start is the best.
• See JK Options Report for further information.
• Space and accommodation issues may be problematic in some sites.
• Requires use of all free portables within District.
• Busing costs, start -up costs are included in the costs.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Knowledge of funding, envelope for JK.
Time Required to Implement
Decision Dates /Milestones
September 1998
April 30 - Staffing issues
Success Evaluation Criteria
JK Programs have been implemented throughout the District.
A.2
L" c, L
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Use differentiated staffing model (Early Childhood Education) for J.K.
Potential Cost Saving
In 1998 -1999 Nil
Annualized Saving ($5,842,000)
Date
Required Investment /Cost to Implement
$5.842 Million (staff costs)
Staff Impact
Present JK teachers return to SK -8 system (elementary)
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Gives all 4 year old equity of access to kindergarten programs across the district.
• Early start in learning as per research.
• Space and accommodation issues may be problematic in some sites.
• Requires use of all free portables within the District.
• Busing costs, start -up costs are included.
• Ongoing training for E.C.E. workers (Language Development) by certified teacher team to provide support.
• Further information available in JK Options Report.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Knowledge of funding model..
• Requires permission of MOET to implement a differentiated staffin model.
Time Required to Implement
Decision Dates /Milestones
September 1998
April 30, 1998 - Staffing issues
Success Evaluation Criteria
A successful JK model program would be in place using differentiated staffing.
A.3
Vl
Ottawa - Carleton District School Board �
BUDGET CHANGE OPTIONS
Option Offer full day JK /Alternate Day
Potential Cost Savine
In 1998 -1999
Annualized Saving ($6,978,000)
Date
Required Investment /Cost to Implement
$6.9 Million
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Reorganization of school programs to have full day alternate day in schools.
• Space may be an issue in some areas.
• Busing costs (noon hour) would be saved.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Knowledge of the funding envelop to JK.
• Communities throughout the District have specific concerns with this model.
Time Required to Implement
Decision Dates /Milestones
By September 1998
April 30
Success Evaluation Criteria
AA
61,
SECTION B: POTENTIAL CHANGES TO REGULAR DAY SCHOOL PROGRAMS
Page
Option
School Year 1998 -99
($ Millions)
School Year 1999 -00
($ Millions)
B.1
Restructure Secondary Schools
9.030
10.020
B2
Restructure Elementary Schools
4.800
4.800
B.3
Close 5 Elementary Schools for September 1998
1.000
1.000
B.4
Close a further 5 Elementary Schools for September 1998
1.000
1.000
B.5
Close a further 5 Elementary Schools and 5 Secondary Schools for
September 1999
0
3.400
B.6
Reduce the per capita school operations budgets by 10% and
harmonize the per capita school operations budget allocations
between the predecessor boards
1.720
1.720
B.7
Reduce School Office staffmg by 10%
1.370
1.370
A
Ottawa - Carleton District School Board
N
BUDGET CHANGE OPTIONS
Option Restructure Elementary Schools
Included within this option are the following Budget Change Option Sheets:
$ In Millions in 98/99
• Reduce the Formula Generating the Number of Elementary Vice - Principals 0.50
• Reduce Elementary Teacher Overlay Positions 0.63
Also included with this option is part of the savings from the Budget Change Option
Sheet for:
• Library Alternative Staffing Arrangements 0.67 (elementary portion only)
Total: 4.80
(See the individual Budget change Option Sheets for further details.)
� Ottawa - Carleton istrict School Board �
BUDGET CHANGE OPTIONS
Option Reduction of Elementary Vice - Principals from school (0 -399)
Potential Cost Saving
Annualized Saving $
In 1998 -99 $504,820.00
$504,820.00
• diminished support to staff and students at the same time as other support services (Special Education) being reduced.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Date: 1999
Required Investment /Cost to Implement
Staff Impact
Nil
• 30 Vice - Principals revert to teaching positions
By March 31, 1998
• 7.5 teacher reduction
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• No Vice - Principal in schools with enrolments <399
Implications:
• Reduction of leadership training opportunities
• diminished support to staff and students at the same time as other support services (Special Education) being reduced.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Current CBE agreement calls for a different principal and a Vice - Principal in every school
• Pending regulations unknown.
Time Required to Implement Immediate (depending on outcome of
Decision Dates /Milestones
appeal to P /VP status)
By March 31, 1998
Success Evaluation Criteria
B.1.1
W
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce the number of "overlay" elementary teaching positions (these are positions not required by the provisions of the current
collective agreements excluding Special Education, ESL, ESD and central teaching positions, which are dealt with in other Budget
Change Options sheets and excluding positions which have been funded by outside sources /grants).
Potential Cost Saving
In 1998 -1999 $3,630,000 Annualized Saving $3,630,000
Date
September, 1998
Required investment /Cost to Implement Staff Impact
Severance /supernumerary costs, if any. Reduction of approximately 79 teaching positions
Impact of Change (e.g., on Student Education, School Community, Board -wide)
These teaching positions are used to reduce class sizes and deal with time tabling constraints in elementary schools. As a result, the reduction
in the number of these positions will result in larger class sizes and increased time tabling constraints in schools.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• The average class size maximum provisions (average maximum of 25 students) in Bill 160 (depending upon the details, in any regulations to
be released as to how this figure is to be calculated).
• Supernumerary /severance provisions in the current elementary collective agreements.
Time Required to Implement Decision Dates /Milestones
Three to four months. April, 1998 (to build the Board's decision into the staffing process).
Success Evaluation Criteria
r' ice' r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Alternative Staffing Arrangements (1)
Library Technicians for Teacher Librarians in Elementary and Secondary Schools
Potential Cost Saving
In 1998 -1999 $1,134,750 Elementary $672,250
Secondary $462,500
Annualized Saving $1,134,750
Date
Required Tnvestment /Cost to Implement
Staff Impact
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Re deployment of 62.25 library teaching staff to regular classrooms
Time Required to Implement
and hiring of 125.5 library technicians.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Reduction of educational services in library resource centres.
• No implementation of "Partners in Action ".
• Reduced services in library resource centres.
• Potential deterioration of library collection.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Current CBE Collective Agreements include mandatory staffing of library by teacher librarians (by formula for both panels).
Time Required to Implement
Decision Dates /Milestones
Could be implemented for 1998 -99 depending on state of Collective
Before spring staffing process.
Agreements.
Success Evaluation Criteria
• Reduced expenditures.
• Continued 'technical' services in all library resource centres.
B.1.3
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure Secondary Schools
Included with this options are the following Budget Change Option Sheets:
$ In Millions in 98/99
• Reorganize Secondary Schools' Teaching Administration Structure 0.22 (in 98/99); $1 (in 99/00)
• Reorganize to Reduce the Number of Secondary Vice - Principals 0.26
• Cooperative Education Alternative Staffing Arrangements 0.72
• Adult Day Secondary School Restructuring 0.60 (in 98/99); $1.30 (in 99/00)
• Change Secondary School Teachers' Instruction /Release Time Allocations 6.00
• Reduce Secondary Teacher Overlay Positions 0.77
Also included with this option is part of the savings from the Budget Change Option
Sheet for:
• Library Alternative Staffing Arrangements. 0.46 (secondary portion only)
Total: 9.03
(See the individual Budget Change Option Sheets for further details.)
r Ottawa - Carleton D District School Board
BUDGET CHANGE OPTIONS
Option Re- organize Secondary Schools' Teaching Administration Structure by Restructuring Direct Curriculum Supervision within
Secondary Schools.
Potential Cost Saving
In 1998 -1999 $214,788
Annualized Saving $509,000
Date Starting September 1998
Required Investment /Cost to Implement
Staff Impact
Nil.
1. Responsibility allowance loss to 118 staff ranging from $2,187-
Collective Agreements
$3,455 /person.
Decision Dates /Milestones
2. 1.83 FTE
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• reduced organization and management.
• reduced curriculum leadership
• reduced supervision of Quality and Accountability
• reduction of Program Development and Implementation.
• reduction of school leadership team.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements
Time Required to Implement
Decision Dates /Milestones
18 months in total
Board Approval
Ratification of Collective Agreements
Meetings with principals
Success Evaluation Criteria
B.2.1
Ottawa - Carleton District School Board T
BUDGET CHANGE OPTIONS
Option Reduction of two secondary Vice - Principals to one Vice - Principal and one Head of Administration (former OBE schools only).
Potential Cost Saving
In 1998 -99
Annualized Saving $ 255,620 (if no red circle status or phase in)
Date
Required Investment /Cost to Implement
Nil.
Staff Impact
Reduction of 2 F.T.E. teachers (Admin. heads teach 1 class)
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Reduced supervision of staff and students, creating more workload for remaining administrators.
• Fewer secondary principal candidates for future leadership roles.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Negotiations item as it moves an administrator into a union position, and reduces the number of teachers.
• Also dependent upon retirements and voluntary reversions of current Vice - Principals (Regulation).
Time Required to Implement
Decision Dates /Milestones
Can be done by September if negotiations are successful.
Decision by the end of May
Success Evaluation Criteria
e33
r r r,
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Alternative Staffing Arrangements (2)
Job Placement Officers for Co- operative Education Teachers.
Potential Cost Saving
In 1998 -1999 $723,044
Annualized Saving $723,044
Date
Required Investment /Cost to Implement
Staff Impact
Time Required to Implement
Re deployment of 50.50 co- operative education teachers to regular
Could be implemented for 1998 -99 depending on Collective
classrooms and hiring of 50.50 Job Placement Officers.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Lower quality of overall service in co- operative education program.
• Elimination of overlays for co- operative education teachers means higher PTR over system as a whole.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Would necessitate Collective Agreement changes re overlays.
Time Required to Implement
Decision Dates /Milestones
Could be implemented for 1998 -99 depending on Collective
Before spring staffing process.
Agreements.
Success Evaluation Criteria
• Reduced expenditures.
• Continued enrolment in co- operative education placements.
Pol
B.2.3
Ottawa - Carleton District School Board
0
BUDGET CHANGE OPTIONS
Option Restructure Adult Credit Programs under Continuing
Education grant.
(Adult High School /Adult Education Program)
Potential Cost Saving
In 1998 -99 $600,000
Annualized Saving $1.3 million
Date
Required Investment /Cost to Implement
Staff Impact
Dependent on the secondary contracts, issue of one year for redundancy
1. Regular day school secondary staff to return to other day schools.
teachers with pay.
2. Increased redundancy in staffing
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Adult students will have a different type of access to credit programs. Students 18 -20 years repatriated to home schools, semestered
schools or an alternate program. Many of these adults are at risk in the regular day school program and have found success in the adult
environment.
• Lack of ancillary services to provide supply to adult learner in terms of counselling and credit evaluation.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Current Collective Agreements - negotiation would be required.
Time Required to Implement
Decision Dates /Milestones
September 1998
April 30, 1998 - Staffing
Success Evaluation Criteria
• There is a successful program for adult students through Continuing Education, which meets the needs of adult students.
• Students, aged 18 -20 years, are successfully placed in an alternate or regular program.
• Graduation rate for adult students remains at current level.
B.2.4
(W (011 460
ice" r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Secondary
Increase the teaching assignment from 6 classes to 7 classes for each FTE secondary classroom teacher in the OCDSB. Loss of 139 teachers.
Potential Cost Saving
In 1998 -1999 $6.OM
Annualized Saving $6.0 M less the cost of severance packages.
Date
Required Investment /Cost to Implement
Staff Impact
• Severance costs for 139 teachers.
• potential impact on staff morale and use of sick leave
• possible cost of duty coverage as teachers may not have assigned
• decrease in resources available for school supervision (Safe
supervisions.
School Issue)
• possible increase in the number of requests for partial leave.
• increased necessity for P /VP to supervise and be in school (loss of
P /VP as resources for Board committees, academies, etc.).
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• possible increase in teacher - centred instruction and narrower use of pedagogical strategies because of reduced preparation time and
increased number of students to teacher.
• potential decrease in time available for staff to be involved in extra - curricular activities (e.g., staff advisors, club sponsors, coaches, etc.).
• Safe School issue if there is a reduction in the formal an informal supervision available (if teachers are in classes for 7 periods, there will
be fewer of them moving about in hallways, etc., and there could be more students "free" in any given period if the school opts for a 9 or
10 period cycle.
• reduction in the number of options available to students as there will have to be more sections of fewer courses.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• savings are only realized if the current aggregate class size > 22.
• at present it is not known which staff count in the divisor to obtain the aggregate class size.
• MOET Regulations may contain specifics that would affect implementation.
• current collective agreements have PTR, WSC, and teaching assignment clauses that would be in conflict.
B.2.5
Secondary (continued) .S
Time Required to Implement Decision Dates/ Milestones
Success Evaluation Criteria
4*00,
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce the number of "overlay" secondary teaching positions (these are teaching positions not required by the provisions of the
current collective agreements excluding Special Education, ESL, ESD and central teaching positions, which are dealt with in other
Budget Change Option sheets, and excluding positions which have been funded by outside sources/ grants).
Potential Cost Saving
In 1998 -1999 $770,000
Annualized Saving $770,000
Date September 1998
Required Investment /Cost to Implement
Severance /supernumerary /unassigned costs, if any.
Staff Impact
Reduction of approximately 18 teaching positions
Impact of Change (e.g., on Student Education, School Community, Board -wide)
These teaching positions are used to deal with timetabling conflicts, reduce class sizes and increase the course offerings available in secondary
schools. As a result, the reduction in the number of these positions will result in increased timetabling conflicts, larger class sizes and possibly
fewer course offerings.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• The average class size maximum provision (average maximum of 22 students) in Bill 160 (depending upon the details, in any regulations to
be released, as to how this figure is to be calculated).
• Supernumerary /unassigned positions in the current secondary collective agreement.
Time Required to Implement I Decision Dates /Milestones
Three to four months.
Success Evaluation Criteria
April, 1998 (to build the Board's decision into the staffing process).
w
B.2.6
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS .
Option Alternative Staffing Arrangements (1)
Library Technicians for Teacher Librarians in Elementary and Secondary Schools
Potential Cost Saving
In 1998 -1999 $1,134,750 Elementary $672,250
Secondary $462,500
Annualized Saving $1,134,750
Date
Required Investment /Cost to Implement
Staff Impact
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Redeployment of 62.25 library teaching staff to regular classrooms
Time Required to Implement
and hiring of 125.5 library technicians.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Reduction of educational services in library resource centres
• No implementation of "Partners in Action"
• Reduced services in library resource centres
• Potential deterioration of library collection
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Current CBE Collective Agreements include mandatory staffing of library by teacher librarians (by formula for both panels).
Time Required to Implement
Decision Dates /Milestones
Could be implemented for 1998 -99 depending on state of Collective
Before spring staffing process
Agreements
Success Evaluation Criteria
• Reduced expenditures
• Continued 'technical' services in all library resource centres
r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option School Closures.
Potential Cost Saving
Cpl
In 1998 -1999 5 elementary schools $1.0 million OR
10 elementary schools $2.0 million
In 1999 -2000 5 secondary and 5 elementary schools
Annualized Saving $200,000 per elementary school closed and
$510,000 per secondary school closed.
Date
(in addition to those closed in 1998 -1999)
Beginning September 1998 and /or 1999.
$3.4 million
• Other contractual arrangements with communities and municipal governments exist in some schools and would have to be addressed if
Required Investment /Cost to Implement
Staff Impact
One -time costs of mothballing closed schools, moving furniture and
Loss of all custodial staff and most library and office staff positions
resources, and renovations if needed to receiving schools. (Exact costs
at each location closed, loss of positions of principals,
depend on which schools are closed and where students are
vice- principals, and other positions of added responsibility such as
redirected).
department heads or chairs.
• Reduction in budget expenditures.
Impact on teaching staff depends on the new total enrolment in the
• Successful relocation of students, staff and programs to designated schools.
receiving schools, which may be entitled to additional staff in some
categories due to increased enrolment.-
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Student disruption as students at closed schools will be relocated to other nearby schools.
• Staff disruption, as staff will be transferred to other locations or laid off according to terms of employment.
• Any school closure will cause a disruption to community life.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Collective Agreements require consultation prior to school closures.
• Other contractual arrangements with communities and municipal governments exist in some schools and would have to be addressed if
those schools are to close.
Time Required to Implement
Decision Dates /Milestones
Six month and Thirteen -month closure procedures have been approved
According to current Board Policy, for September 1998 closure, schools
under Board policy. (Reference Policy P.013.PLG and Procedure
considered for closing must be named in June 1998. For September 1999
PR.508.PLG)
closure, schools must be named by December 1998.
Success Evaluation Criteria
• Reduction in budget expenditures.
• Improvement in district student capacity usage ratings.
• Successful relocation of students, staff and programs to designated schools.
1:Transportation.16
13.3, B.4, 13.5
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option School Operation Budgets
Reduce the per capita school operation budgets by 10% and harmonize the per capita school operation budget allocations between the
predecessor boards.
Potential Cost Saving
In 1998 -1999 $1.720 M
Annualized Saving $1.720 M
Date September 1998
Required Investment /Cost to Implement
Staff Impact
None
• decreased resources for instructional use
• decrease opportunities for innovative, progressive instruction
strategies
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• potential for increase in costs of supplies to parents and students.
• increase in course fees at the secondary level, particularly for skill -based courses.
• increase in costs to students /parents for field trips, transportation, etc.
• possible reduction in the types of programs, strategies, and activities that can be offered.
• introduction of user fees (e.g., photocopying, classroom supplies).
• reduction of equipment /supplies in some areas will restrict the variety of teaching strategies.
• personal costs to students to participate in classroom activities may restrict course selection.
• total personal costs for in -class and extracurricular activities may significantly reduce options for less financially able students.
• reduction in funding of field trip allocations (primarily used to transport sports teams) will increase costs to team members.
• reduction in temporary assistance allocation inhibits the ability of school office staff to complete reports, prepare examinations, and
coordinate activities such as awards celebrations or commencements.
• "outside" groups wishing to access school funds (e.g., School Councils, charities) will have to be denied.
• school budgets in the former CBE schools have already been reduced; additional reductions will further inhibit "normal' operations.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None
on
460� (W L�_'
s
r r r
Time Required to Implement Decision Dates/ Milestones
Could be phased in at 5% over each of the next two years. May 15, 1998 - Schools must know their budget allocations in order to
process orders for the following school year.
Success Evaluation Criteria
Schools continue to function with ample and equitable opportunities for all students.
Cost to students to participate does not prohibit course or extramural program selection.
Instructional strategies in use are varied and effective and not limited to traditional lecture, pencil and paper learning.
B.6
3
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce School Office Staff by 10 %.
Potential Cost Saving
Annualized Saving $
$1,370,307.00
Total of $1,370,307.00 based on harmonization of existing staffing
policies and then a 10% overall reduction in staffing formula
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
allocations using the 1997/98 staffing figures of 402.21 FTE.
Time Required to Implement
Decision Dates /Milestones
Date: Effective 1 September 1998
Required Investment /Cost to Implement
Staff Impact
• Investment of additional funds for training to new incumbents
based on bumping provisions.
. Potential reduction of approximately 100 employees
• Cost of severance to employees on layoff as a result of bumping
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Some school office may be closed at various times during the school day to accommodate breaks /lunch
periods
• Time lines for office work must be extended.
• Reduced service to School Councils
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Layoffs, bumping, reassigning - up to 6 months
Time Required to Implement
Decision Dates /Milestones
Success Evaluation Criteria
1i7
�9.
SECTION C: POTENTIAL CHANGES TO SPECIAL EDUCATION
Page
Option
School Year 1998 -99
($ Millions)
School Year 1999 -00
($ Millions)
C.1
Reduce expenditures for Special Education by 10%
5.800
5.800
C.2
I Reduce expenditures for Special Education by a further 10%
5.800
5.800
Ottawa - Carleton District School Board
a
BUDGET CHANGE OPTIONS
Option #1 A 10% decrease in the Special Education /Student Services budget.
Potential Cost Saving
In 1998 -1999 $5.8 million
Annualized Saving $5.8 million
Date Starting September 1998
Required Investment /Cost to Implement
Staff Impact
None currently identified.
• current staffing levels are:
Board approval.
537.17 - academic
School Staffing timelines.
589.60 admin. & support.
Collective Agreement
• depending upon decision of delivery model for programs and
timelines.
services, current staff levels will be affected.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The current level of central and in- school programs and services will have to be adjusted to respond to reductions.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements, legislation regarding exceptional students, Board policies and practices.
Option: Special Education and Student Services
Decision Dates /Milestones
The Special Education and Student Services Department has two key responsibilities:
Board approval.
(1) to assist in the identification and education of exceptional students; and
School Staffing timelines.
(2) to support specific students in the regular classroom on an as need basis.
Collective Agreement
Both of the former Boards recognized and responded to the needs of its learners. In order to develop a model for the operation
timelines.
of Special Education and Student Services in the OCDSB, staff have developed a series of work plans to address the
integration of the two departments.
The areas for study were identified in the Amalgamation Planning Charts developed by the Joint Senior Staff. There are
approximately 14 Action Plans which examine services (psychology, social work, speech and languages, etc.) and screening
procedures, the IPRC process, etc.
Added to and simultaneously, there is a need to respond to the financial constraints as anticipated by the funding model. The
work plans have been structured to provide recommendations by the end of March or the first part of April. The work plans
also reflect the involvement of a number of stakeholders in the process. The recommendations as to the best way to integrate the
department within the financial constraints will be the result of this work.
Success Evaluation Criteria
A continuum of programs and services will continue to be provided to students.
CA
r C.' r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option #2 A 20% decrease in the Special Education/ Student Services budget.
PnfPnfial C'ncf Snuino
In 1998 -1999 $11.6 million
Annualized Saving $11.6 million
Date Starting September 1998
Required Investment /Cost to Implement
Staff Impact
None currently identified.
• current staffing levels are:
Board approval.
537.17 - academic
School Staffing timelines.
589.60 admin. & support.
Collective Agreement
• depending upon decision of delivery model for programs and
timelines.
services, current staff levels will be affected.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The current level of central and in- school programs and services will have to be adjusted to respond to reductions.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements, legislation regarding exceptional students, Board policies and practices.
Option: Special Education and Student Services
Decision Dates/ Milestones
The Special Education and Student Services Department has two key responsibilities:
Board approval.
(1) to assist in the identification and education of exceptional students; and
School Staffing timelines.
(2) to support specific students in the regular classroom on an as need basis.
Collective Agreement
Both of the former Boards recognized and responded to the needs of its learners. In order to develop a model for the operation
timelines.
of Special Education and Student Services in the OCDSB, staff have developed a series of work plans to address the
integration of the two departments.
The areas for study were identified in the Amalgamation Planning Charts developed by the Joint Senior Staff. There are
approximately 14 Action Plans which examine services (psychology, social work, speech and languages, etc.) and screening
procedures, the IPRC process, etc.
Added to and simultaneously, there is a need to respond to the financial constraints as anticipated by the funding model. The
work plans have been structured to provide recommendations by the end of March or the first part of April. The work plans
also reflect the involvement of a number of stakeholders in the process. The recommendations as to the best way to integrate the
department within the financial constraints will be the result of this work.
Success Evaluation Criteria
A continuum of programs and services will continue to be provided to students.
C.2
N .VA
SECTION D: POTENTIAL CHANGES TO STUDENT SUPPORT PROGRAMS
Page
Option
School Year 1998 -99
($ Millions)
School Year 1999 -00
($ Millions)
D.1
Eliminate Board funding of Lighthouse program
.320
.436
D.2
I Eliminate Community Living / Autism Summer program
.436
.436
D.3
Reduce funding of Outdoor Education Centres
.100
.100
DA
Close Outdoor Education Centres
.559
.559
D.5
Offer Post 21 program on cost- recovery basis only
.080 -
.080
D.6
Eliminate Board funding of Focus on Future program
.438
.438
D.7
Establish a Focus on Future program in former CBE schools
.438
.438
D.8
Realign ESL/ESD staffing
0
0
D.9
Realign and retrain Multi -Media Technicians to work in former
CBE Elementary and Secondary schools supporting computer
systems
0
0
1E
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Cancel Lighthouse program.
Potential Cost Savine
In 1998 -99 approximately $320,000
Annualized Saving $320,000
Date
Required Investment /Cost to Implement
Staff Impact
Nil.
Loss of 15 CEC positions, plus central office co- ordinator and support
• community reaction to the loss of these programs.
staff. Seniority clauses will cause bumping in system.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• reduced opportunities for children and families through a reduction of school -based programming.
• impact on the daily operation of the related schools will be felt at noon hour, in Breakfast Programs and School Councils.
• large bank of volunteers may be lost to the system unless there is a plan to make use of community skills.
• School Outreach developed in partnership by lighthouse and school may be lost or reorganized under the Principal and the School
Council.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• community reaction to the loss of these programs.
• no requirement through collective Agreements or Board Policy to run the program.
Time Required to Implement
Decision Dates /Milestones
Completed for June 30, 1998
Success Evaluation Criteria
D.1
w
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Eliminate Community Living /Autism Summer program.
Potential Cost Saving
In 1998 -99 $436,000
Annualized Saving $436,000
Date
Required Investment /Cost to Implement
Staff Impact
N/A
Downsize of partial position in Continuing Education Summer School
Time Required to Implement
contract, summer school teachers and educational assistants would be
1 year - Plans to run for summer 1998 underway as (two Board
laid off.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• No summer programs for high needs, special education students.
• There is no outside agency to provide: community has traditionally looked to the Board.
• Loss of key skills developed by youngsters over the summer.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Summer school for Developmentally Delayed in Two -Board Agreement. This would require a re- negotiation of this Agreement in terms of
the mentally challenged.
Time Required to Implement
Decision Dates /Milestones
1 year - Plans to run for summer 1998 underway as (two Board
agreement is in place.
Success Evaluation Criteria
• $436,000 saved
• Community is able to put an alternate program in place to provide supply for special needs youngsters
D.2
460, (boll (1,01
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option MacSkimming Outdoor Education Centre
Continue to operate MacSkimming Outdoor Education Centre. Centre is currently in the first year of three -year business plan aimed at cost
recovery. In 1997 expenses to operate the centre were $402,000 with an income of $176,355. Cost to Board $225,645. Integrate the option of the
BMC with the MacSkimming Outdoor Education Centre.
Potential Cost Saving
In 1998 -1999
If the goal of the business plan is achieved the savings will be
Annualized Saving cost recovery
Date
$255,000 over two years. $50,000 to $80,000 (Year 2)
• base budget to support outdoor education for elementary and secondary schools.
Required Investment /Cost to Implement
Staff Impact
Recommendation: Give Continuing Education staff the mandate to
To be developed under the mandate to develop an integrated model.
develop a plan for continued operation of both MacSkimming and BMC
is unavailable, requiring students to change option selections.
under an integrated model at reduced cost.
MacSkimming /Bill Mason Centres continue to operate at reduced cost.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• will allow staff to develop a plan to integrate the operation of BMC and MacSkimming at reduced cost.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
There are none related to Collective Agreements, legislation or Board Policy.
• base budget to support outdoor education for elementary and secondary schools.
Time Required to Implement
Decision Dates /Milestones
Development of plan by May 8,1998 with implementation of the plan
March 31- program offerings in some schools may change if the centre
for the school year 1998 -99.
is unavailable, requiring students to change option selections.
Success Evaluation Criteria
MacSkimming /Bill Mason Centres continue to operate at reduced cost.
D.3.1
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Bill Mason Centre
Continue to operate the BMC at reduced cost. Integrate the operation of the BMC with the MacSkimming Outdoor Education Centre.
Potential Cost Saving
In 1998 -99 Salaries: $282,319; Operating Budget: $22,119
Total: $304,428
Annualized Saving $60,000
Date
Restructure to save $60,000
To be developed under the mandate to develop a business plan for
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
MacSkimming and Bill Mason Centres.
Required Investment /Cost to Implement
Staff Impact
Recommendation: Give Continuing Education staff the mandate to
Development of plan by May 8,1998 with implementation of the plan
develop a plan for continued operation of both MacSkimming and BMC
for the school year 1998 -99.
under an integrated model at reduced cost.
Success Evaluation Criteria
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• an integration and rationalization of the staff of the Bill Mason Centre and MacSkimming.
• use of outdoor education facilities.
• target date for the development of the plan would be May 8, 1998.
• SAT presently under Continuing Education whose objective is to be cost-recovery.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
No constraints related to Collective Agreement, legislation or Board Policy.
• Base budget required to support outdoor education.
Time Required to Implement
Decision Dates /Milestones
Development of plan by May 8,1998 with implementation of the plan
March 31- program offerings in some schools may change of the centre
for the school year 1998 -99.
is unavailable, requiring students to change option selections.
Success Evaluation Criteria
BMC continue to operate at reduced cost.
D.3.2
kwl ( I W (MOW
r^ r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Close MacSkimming Outdoor Education Centre.
Potential Cost Savine
In 1998 -99 $255,000
Annualized Saving $255,000
Date
Required Investment /Cost to Implement
Staff Impact
There will be some cost involved in mothballing the sire and
Layoff of 1 elementary teacher;1 co- ordinator; 2 outdoor education
maintaining the site until such time as the property is sold. Cost to be
facilitators; 1 office administrator; 1 supervisor of maintenance;
determined.
1 assistant supervisor of maintenance;1 custodian.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Closure of the MacSkimming Centre will severally impact on the outdoor education program in OCDSB, both during the school year and in
the summer.
• Business Plan has met its objective for Year 1 and is well on the way to meeting Year 2 - (3 year cost-recovery)
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• no constraints related to Collective Agreement, legislation or Board Policy.
• Disposing of the site may prove to be problematic with respect to finding a purchaser, as much of the area is environmentally sensitive
(Ministry of Environment)
Time Required to Implement
Decision Dates /Milestones
Shutting down the facility could occur by August 1998. The length of
May 31,1998
time required to dispose of the property through sale is undetermined.
Success Evaluation Criteria
Centre closed. Property sold.
D.4.1
IN
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Bill Mason Centre
Close Bill Mason Outdoor Education Centre
Potential Cost Saving
In 1998 -99 $304,428
Annualized Saving $304,428
Date September 1998
Required Investment /Cost to Implement
Staff Impact
Some minimal cost may be incurred in maintaining property until it is
Lay off current staff: 1 Director (teacher); 3 Outdoor Education
sold.
Interpreters (10 month);1 Office Assistant (10.5 month);1 Outdoor
June 1998
and Environmental Resource Teacher.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Closure of the centre would result in significant loss of opportunity for OCDSB students to experience outdoor and environmental education.
• As centre is run by West Carleton Secondary School, there will have to be significant changes to the objectives of the school.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
No constraints related to Collective Agreement, legislation or Board Policy.
• Disposing of the site may prove to be problematic with respect to finding a purchaser.
Time Required to Implement
Decision Dates /Milestones
Shutting down the facility could occur by August 1998. The length of
June 1998
time required to dispose of the property through sale is undetermined.
Success Evaluation Criteria
Centre closed. Property sold.
D.4.2
tavol (4011, 46s,010
0
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Post -21 Program - Grant - Cost Recovery Only.
The Post -21 Program under Continuing Education was eliminated in the 1997 OBE Budget. In December 1997, a grant was received from the
Literacy Secretarial to support the program to April 1, 1998. No grant has been forthcoming to continue the program.
PntPntial Cnst Savincy
In 1998 -1999 $80,000 (if not granted)
Annualized Saving $80,000
Date
Required Investment /Cost to Implement
Staff Impact - Teachers under Continuing Education contracts will be
N/A
laid off.
N/A
September 1998
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Without a grant, program for developmentally delayed adults will cease to exist under ABE umbrella.
• Students will be wait - listed for other day programs under COMSOC.
• Partnership with COMSOC ($45,000) will be lost.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
September 1998
Continuing Education staff is investigating with parents, other
sources of funding for this program.
Success Evaluation Criteria
D.5
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Elimination of Focus on Future dollars.
Potential Cost Savina
In 1998 -1999 $437,700
Annualized Saving $437,700
Date March 3, 1998
Required Investment /Cost to Implement
N/A
Staff Impact
Nil.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• All nutrition and literacy initiatives funded by Focus on Future would be eliminated. Twenty -three former OBE elementary schools and
seven secondary schools would not receive extra dollars for the above.
• Research indicates that extra funding for children at risk in elementary and secondary schools has positive benefits (Offord, 1995, 1996)
• Partnerships established with Breakfast Programs (O.C.L.F. Canadian Living Foundation, Ottawa Food Bank would require a
reorganization to the school level.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Community has a strong commitment to Focus on Futures.
Time Required to Implement
Decision Dates /Milestones
N/A
Budget decisions.
Elimination of programs, June 30,1998.
Success Evaluation Criteria
N/A
m
(Wel (W (aw,
r i^ r^
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Establish a Focus on Future Programs in former CBE schools, by reviewing present focus concept and implementing an enhanced
strategy across the District. The use of a new Poverty Index (MOET, Inner City Index) to ascertain school needs. An evaluation of the program
component will be built in.
Potential Cost Saving
In 1998 -1999 ($438,000)
Annualized Saving ($438,000)
Date 6/3/98
Required Investment /Cost to Implement
($.438 Million)
Staff Impact
Nil
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Higher focus on at risk students - literacy, numeracy, aesthetics, professional development, community partnerships.
• Extension of nutrition programs, but with enhanced partnerships with private sector and Canadian Living Foundation.
• Extension of literacy /numeracy initiatives, with an implementation and evaluation component.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Nil.
Time Required to Implement 4 months
Decision Dates /Milestones
(To establish which former CBE schools would meet established
Budget Decisions
criteria)
Implementation for September 1, 1998
Success Evaluation Criteria
• Redevelopment of Poverty Index to meet the needs of the District children.
• Evaluation of pilot programs in literacy and numeracy by Program and Student Evaluation staff
• School community feedback on effectiveness of new initiatives
• Partnership with "Carleton Studies of Students At Risk" - MacMaster- Sherbrooke Centre
D.7
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Rationalize the ESL /ESD staffing within the parameters of the applicable grant in the new grant structure.
Potential Cost Saving
In 1998 -1999 Dependent on funding. None envelop for ESL /ESD.
Annualized Saving
Date September 1, 1998
Required Investment /Cost to Implement
N/A
Staff Impact - Difficulty to ascertain until funding model is known.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Maintain staffing support for ESL /ESD programming and establish equitable allocation to schools in the former Boards.
• See Report on ESL /ESD Options for further information
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Subject to decisions made in the Collective Bargaining process.
Time Required to Implement
Decision Dates /Milestones
September 1998
Success Evaluation Criteria
ESL /ESD staffing distributed systematically across the OCDSB within structure of the funding grants.
M:
(W- (60.11 ('11-V
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Realign and retrain Multi Media Technicians to work in for CBE Elementary and Secondary Schools to supply computer systems
Potential Cost Saving
In 1998 -1999 N/A
Annualized Saving N/A
Date
Required Investment /Cost to Implement
Staff Impact
Training costs for upgrading to standards and skills required for a
Staff would receive technology training and would be required to
technician.
support a family of schools, rather than just the secondary school, in
both Mac and PC environments. If skill set required cannot be
Computer technicians would provide support to all elementary and secondary schools ;in the O.C.D.S.B.
matched, some redundancy and bumping could occur.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Secondary schools would have reduced basic support, but increased hardware/ software support; elementary schools would have additional
support; harmonize the service model of both boards and allow for cross - fertilization between PC and MAC platforms and networks as we
move into a long -term infrastructure project.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Requires permission of MOET to implement a differentiated staffing model.
Time Required to Implement
Decision Dates /Milestones
September 1998
Success Evaluation Criteria
Computer technicians would provide support to all elementary and secondary schools ;in the O.C.D.S.B.
•
j4'
SECTION E: POTENTIAL CHANGES RELATED TO TRANSPORTATION
School Year 199 8-99
School Year 1999 -00
Page
Option
($ Millions)
($ Millions)
E.1
Change school opening and closing times to generate
transportation savings
1.100
1.100
E.2
Eliminate all normal transportation entitlements for students in
Grades 7 to OAC who live within the Ottawa - Carleton urban
transit area
.400
.400
E.3
Reduce provision of OC Transpo to eligible financially
disadvantaged students from ten months to eight months
.030
.030 -
EA
Eliminate the provision of OC Transpo to students on co- operative
work placements
.150
.150
E.5
Eliminate all busing to Canterbury High School's arts program
.245
.245
E.6
Eliminate all busing to Colonel By Secondary School's
International Baccalaureate
.040
.040
E.7
Reduce noon hour transportation to Secondary School Alternate
Program
.100
.100
E.8
Eliminate transportation to Elementary Middle Immersion
.060
.060
E.9
Eliminate transportation to Elementary Alternative Schools
.190
.190
E.10
Eliminate transportation to Elementary Congregated Gifted
programs
.125
.125
E.11
Schedule Professional Development days to coincide with
coterminous Board to generate transportation savings
.024
.024
E.12
Cancel Summer School transportation for Special Education
students
.115
.115
E.13
Accept advertising on the Board's school buses
100
.100
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "A" Additional opportunities for Transportation efficiencies through further Staggering of School Opening and Closing Times
Maximize vehicle utilization through expanded double /triple/ quadruple route arrangements by further staggering of school opening /closing
times. Expanded opportunities for shared runs with the OCCDSB where possible.
Assumptions:
• "status quo" entitlement /eligibility provisions for student transportation.
• a range of school opening /closing times are as follows:
• Elem.(urban) schools earliest at 8:00 am. - 2:30 pm.; latest at 9:30 am. - 4:00 pm.
• Elem. (rural) schools earliest at 8:15 am. - 3:45 pm.; latest at 9:15 am. - 3:45 pm.
• Sec. (urban & rural) earliest at 8:00 am. - 2:15 pm.; latest at 9:30 am. - 4:00 pm.
• expanded cooperation with our coterminous board, the Ottawa - Carleton Catholic District School Board ( OCCDSB)
• flexibility to drop -off and pick -up transported students, 15 minutes before and after school opening /closing times.
• no changes in school attendance areas other than those already approved by the board for 1998 -99.
Geographical areas where further changes are possible:
i) within former CBE (Cumberland Township, Osgoode Township, West Carleton Township/ City of Kanata)
• $815,000. Estimated Savings
ii) within former OBE (City of Ottawa - Western Area)
• $35,000. Estimated Savings
iii) border areas (Cities of Nepean /Ottawa /Gloucester /Orleans)
• $250,000. Estimated Savings
Potential Cost Savine
In 1998 -1999 $1.1 Million
With the increased conterminous sharing and efficiencies proposed in
Annualized Saving $1.1 Million
Date Effective September 1998
this option, there will be additional savings to the Board's
Coterminous School Board which are not reflected in the above noted
savings.
Required Investment /Cost to Implement
Staff Impact N/A
N/A
E.1
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• This change may have a negative impact on enrolment; disruption to school community with initial change; earlier pick -up and later
drop -off times for students.
• This saving can be achieved by maintaining the current entitlement distances.
• If Gr. 7 - OAC transportation is cancelled in the urban area of the former CBE, the savings of this option can still be achieved through a
major route reorganization with further school time changes. This would require further study by staff.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement
Decision Dates /Milestones
Decision in April 1998, leaving 4 to 5 months for community
Decision by Board in April 1998, early consultation with School
notification and route implementation.
Principals.
School community notification in May 1998.
Implementation for September 1998.
Success Evaluation Criteria
Reduced transportation expenditures will help to meet any potential reduction in funding from the Ministry of Education and Training.
.-C)
r r,
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "B" - Harmonization of Student Transportation Policies
W
i) eliminate transportation for Grades 7 to OAC in the urban areas of the former CBE, including areas covered by OC Transpo's urban transit
limits (UTA).
The boundaries of the UTA extend beyond the limits of the NCC Greenbelt and cover the areas of the urban portion of the city of Kanata,
the Barrhaven and Longfields /Davidson Heights communities in the City of Nepean, Blackburn Hamlet, Blossom Park and Orleans,
encompassing Convent Glen, Chapel Hill North and South and Queenswood /Chatelaine Village, Queenswood Heights and
Fallingbrook.
This option would be consistent with the eligibility criteria of the former OBE in that all urban areas would not be provided with
transportation for Grades 7 to OAC. Currently, Grades 7 to OAC students of the former OBE are not provided with transportation unless
they are financially disadvantaged and meet the distance entitlement requirement.
With this option, it is assumed that transportation will continue to be provided for students who are financially disadvantaged and
meet the criteria as contained in each of the policies of the two former Boards.
Potential Cost Savine
In 1998 -1999
• If former OBE Policy is adopted - Estimated Net $400,000.
Annualized Saving
• If former OBE Policy is adopted - Annualized Savings - $400,000.
• If former CBE Policy is adopted - Annualized Cost - $440,000.
Date
• If former CBE Policy is adopted - Estimated Additional Cost
$440,000. Assumes that students would receive passes for 10
months.
Incorporates estimated costs for financially disadvantaged students.
Required Investment /Cost to Implement
Staff Impact
N/A
N/A
E.2
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Based on current 1997 -98 data, an estimated 4,250 students (Sec. = 2,600; Elem. = 1,650) will be impacted by this option. As a result, parents and
students will be responsible for their own transportation to /from school. Negative impact on enrolment expected as students may opt to attend
other schools outside the Board's jurisdiction, which are more accessible and where transportation is provided. Students impacted by this
option reside greater than 3.0 km. for Gr's. 7 & 8 and 4.0 km. for Gr. 9 - OAC. These distances are not walking distances and will necessitate
students obtaining some form of transportation to attend school at parental expense.
The cooperation of OC Transpo is required in order to ensure the availability of public transit service or an alternative for the affected
students. Staff have consulted with OC Transpo representatives to determine the availability of OC Transpo service in the event the Board
decides to implement this option. OC Transpo are currently assessing their ability to supply the additional service by September 1998 for the
approximately 4,000 students currently transported on yellow school buses inside the UTA. A response is expected from OC Transpo for the 23
March 1998 board Meeting. It is expected that staff will be in a position to report on the results of the consultation with OC Transpo at that
time. Students will expect to attend their closest school irrespective of their school attendance boundary which will cause fluctuations in
enrolment levels, programs, capacities and staffing.
If on the other hand, the Board were to adopt the former policy of the CBE and provide transportation for all Grades 7 to OAC, the additional
cost to the Board would be $440,000.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy on transportation entitlement needs to be harmonized to address this option. Some students may be impacted by Section 21(2)
Education Act. A student may be excused from attendance at school if transportation is not provided by the Board for the child and there is no
school that the child has a right to attend is situated within 4.8 kms. from the child's residence measured by the nearest road if the child has
attained the age of ten years on or before the first school day in September in the year in question.
Time Required to Implement
Decision Dates /Milestones
• Optimal time of one -year period to meet OC Transpo's
March /April /98 Community Consultation.
requirements, e.g.. extra vehicles.
April /May /98 Boundary Decision and Community Notification.
• 5 months from an April Board decision.
Success Evaluation Criteria
Reduced transportation expenditure levels.
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "B" - Harmonization of Student Transportation Policies
ii) reduce provision of OC Transpo from 10 to 8 months for eligible students of the former CBE who are financially disadvantaged and meet
the distance entitlement criteria, consistent with the former OBE policy.
Potential Cost Saving
In 1998 -1999
Annualized Saving
• If former OBE Policy is adopted - Estimated Net Savings $30,000.
• If former OBE Policy is adopted - Annualized Savings $30,000.
• If former CBE Policy is adopted - Additional Cost $95,000.
• If former CBE Policy is adopted - Annualized Additional Cost
$95,000.
Date
Board policy needs to be revised and harmonized to account for differences in two former Board policies.
Time Required to Implement
Effective September 1998
Required Investment /Cost to Implement
Staff Impact
N/A
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Approximately 320 students would be impacted by this option. Students would have to provide their own transportation during the two non-
winter months ( September and June). During these two months, students would at least not experience any of adverse weather conditions in
travelling to and from school.
If the Board were to adopt the former CBE policy of providing OC Transpo for 10 months for students who meet the distance and financial
criteria, an estimated additional cost of $95,000.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy needs to be revised and harmonized to account for differences in two former Board policies.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
Board Decision - April 1998.
Notification to affected parents and students - May 1998.
Success Evaluation Criteria
Reduced transportation expenditure.
E.3
Ottawa - Carleton District School Board o
0
BUDGET CHANGE OPTIONS
Option "B "" - Harmonization of Student Transportation Policies
iii) cancel provision of 5 month OC Transpo Passes /Tickets to former CBE secondary students requiring transportation to cooperative work
placements, consistent with former OBE policy in this area.
Potential Cost Saving
In 1998 -1999 $150,000
Annualized Saving $150,000
Date Effective September 1998
Required Investment /Cost to Implement
Staff Impact
N/A
Guidance staff may be required to spend more time identifying work
Decision Dates /Milestones
placements accessible to students in areas closer to their home schools.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Will impact on students requiring transportation to attend a work placement, such that their participation in the program may be reduced.
• The lack of transportation may also alter and limit their choices for an appropriate work placement.
• Students /parents will be required to provide their own transportation to /from the cooperative work placement.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy needs to be revised and harmonized to account for differences in two former Board policies.
Time Required to Implement
Decision Dates /Milestones
April - September 1998.
Board Decision - April 1998.
Notification to affected parents and students - May 1998
Success Evaluation Criteria
Reduced transportation expenditures.
If student participation rates in the cooperative work programs continue at current rates despite the cancellation of Board Transportation.
EA
r r r
Ottawa - Carleton District School Board i
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
i ) cancel transportation for former CBE students attending the Canterbury H.S. Arts Program consistent with the former OBE policy.
Potential Cost Saving
In 1998 -1999 In 1998 -99 $245,000
Annualized Saving $245,000
Date Effective September 1998
Required Investment /Cost to Implement
Staff Impact
N/A
Potential staffing impact at Canterbury H.S. if student enrolment is
Time Required to Implement
reduced.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
An estimated 300 students will be impacted by this option.
Approximately 200 of these students reside in rural areas, not accessible to CC Transpo. Parents and students will be responsible for their own
transportation. If these students opt to attend their designated home schools and are eligible for transportation, students can be accommodated
on existing bus routes at no additional cost.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy to be reviewed.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
School Community Consultation - March /April 1998.
Board Decision - April 1998.
Notification to affected parents /students - May 1998
Success Evaluation Criteria
Reduced transportation expenditure.
E.5
Ottawa - Carleton District School Board
d
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
ii) cancel transportation for former CBE students attending the International Baccalaureate Program at Colonel By S.S.
Potential Cost Savine
In 1998 -1999 $40,000
Annualized Saving $ 40,000
Date Effective September 1998
Required Investment /Cost to Implement
N/A
Staff Impact
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Impact for students currently residing in rural areas; (Cumberland, rural Gloucester and Osgoode) where access to public transit is not currently
available.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy needs to be revised and harmonized to account for differences in two former Board policies.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
School Community Consultation - March /April 1998.
Board Decision - April 1998.
Notification to affected parents /students - May 1998
Success Evaluation Criteria
Reduced transportation expenditure.
E.6
4401, Lov 4600
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
iii) cancel noon -time transportation for former CBE students attending the secondary alternate program at the three designated centres. Still
assumes the provision of am. /pm. transportation to the program.
Potential Cost Saving
In 1998 -1999 $100,000
Annualized Saving $ 100,000
Date Effective September 1998
Required Investment /Cost to Implement
Staff Impact
N/A
Additional supervision will be required for students while they wait
April - September 1998
at school for their return transportation home.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Students registered in the half day programs would be required to remain at school an approximate 3 additional hours. each day.
• Students are predominantly rural and cannot access public transit.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
April - September 1998
Board Decision - April 1998.
Notification to affected parents/ students - May 1998
Success Evaluation Criteria
Reduced transportation expenditure.
E.7
f�
.f
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
iv) cancel transportation for former OBE students attending the Elementary Middle French Immersion Program.
Potential Cost Saving
In 1998 -1999 $60,000
Annualized Saving $60,000
Date Effective September 1998
Required Investment /Cost to Implement
N/A
Staff Impact
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Currently the former OBE offers a Middle French Program in three schools; D. Roy Kennedy, Featherston and Overbrook. There are
approximately 400 students in the program of which approximately 190 are transported.
Depending on the location of the MFI program, the cancellation of transportation may impact on the numbers of students registering /attending
the MFI program, resulting in an impact on staffing levels and programs.
No anticipated impact on transportation requirements, should students opt to attend their home school. For those students requiring
transportation in accordance with the eligibility requirements, arrangements will be covered through existing routes.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy on transportation needs to be revised.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
School Community Consultation - March /April 1998.
Board Decision - April 1998.
Notification to affected parents/ students - May 1998
Success Evaluation Criteria
Reduced transportation expenditures.
E.8
LW (W Lot
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
v) cancel transportation for former OBE students attending the Elementary Alternative School Program.
Potential Cost Saving
In 1998 -1999 $190,000
Annualized Saving $190,000
Date Effective September 1998
Required Investment /Cost to Implement
N/A
Staff Impact
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Currently the former OBE offers a Elementary Alternative School Program in five schools; Grant, Churchill, Lady Evelyn, Crichton and
Riverview Alternative. There are approximately 1,700 students enrolled in the program of which approximately 1,100 are transported.
The cancellation of transportation (in the am /noon and pm periods) may impact on the numbers of students registering/ attending the
Alternative Elementary Program, resulting in an impact on staffing levels and programs.
An additional one bus may be required to provide transportation for these students if they attend their home school. This has been reflected in
the estimated net savings for this option.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy on transportation needs to be revised.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
School Community Consultation - March /April 1998.
Board Decision - April 1998.
Notification to affected parents/ students - May 1998
Success Evaluation Criteria
Reduced transportation expenditures.
E.9
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "C" - Cancellation of Transportation to Specialty Programs and Congregated Centres
vi) cancel transportation for former OBE students attending the congregated elementary gifted program.
Potential Cost Saving
In 1998 -1999 $125,000
Annualized Saving $125,000
Date Effective September 1998
Required Investment /Cost to Implement
N/A
Staff Impact
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
If transportation is cancelled for students attending the Congregated gifted elementary program and students opt to attend their designated
home school, the needs of the affected students will be addressed at their home school. This option will impact approximately 325 students.
The cancellation of transportation may impact on the number of students registering/ attending the congregated gifted elementary program,
which could result in an impact on staffing levels and programs.
No anticipated impact on transportation requirements, should the students opt to attend their home school.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Board policy on transportation needs to be revised.
Time Required to Implement
Decision Dates /Milestones
April - September 1998
School Community Consultation - March /April 1998.
Board Decision - April 1998.
Notification to affected parents /students - May 1998
Success Evaluation Criteria
Reduced transportation expenditures.
E.10
(moo,
r r r"
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "D" - Eliminate Uncommon PA Days and Associated Transportation Costs
Based on the current 1997 -98 calendar, this option assumes six uncommon PA Days.
Potential Cost Saving
In 1998 -1999 $24,000
Annualized Saving $24,000
Date Effective September 1998
Required Investment /Cost to Implement
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Streamlined transportation arrangements between the two Boards requiring cooperation of the Coterminous Board in achieving a common
school year calendar. Currently, 57 buses /routes are affected by the uncommon PA days that exist between the two Boards. Transportation
costs associated with uncommon PA days will increase with expanded sharing of transportation.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
March - September 1998
Early decision in preparation for upcoming school year.
Success Evaluation Criteria
• Reduced transportation expenditure.
• Streamlined and efficient transportation.
E.11
O
Ottawa - Carleton District School Board
0
°Q
BUDGET CHANGE OPTIONS
Option "E" - Cancel Summer School Transportation that is not cost recovery.
Cancel transportation for summer school programs operated under the umbrella of the Two -Board Memorandum of Agreement regarding
Educational Programs for Ottawa and Carleton School Age Pupils with Developmental Disabilities, beginning July 1999.
Potential Cost Saving
In 1998 -1999 Net Savings of $115,000
Annualized Saving $115,000
Date July 1998
Required Investment /Cost to Implement
Staff Impact
N/A
Enrolment in the summer program may decline as a result of the
Time Required to Implement
cancellation of summer school, and create a staffing impact.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Cancellation of transportation for students attending summer school programs covered under the Two -Board Memorandum of Agreement will
impact on the enrollment in the program. Students retention of what they learned in the current school year will be affected if students are not
able to attend summer school by providing their own transportation.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Two -Board Memorandum of Agreement provisions which are in effect until the end of July 1998. Consideration of this option is possible for
implementation July 1999, with advance notice.
Time Required to Implement
Decision Dates /Milestones
One year.
A decision is required in 1998, for implementation in July 1999.
Success Evaluation Criteria
Reduced transportation expenditure.
E.12
i^ r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "G" - Advertising on School Buses
Potential revenue to be generated by advertising on the inside /outside of the buses.
Potential Cost Saving
In 1998 -1999
$100,000. potential revenue year 1.
Annualized Saving
Date $100,000. year 1.
$200,000. potential revenue year 2
$200,000. year 2
Required Investment /Cost to Implement
Staff Impact
Initial and ongoing set -up costs to be recovered through advertising
N/A
revenue and is accounted for in the estimated revenue above.
Success Evaluation Criteria
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Subject to cooperation of carriers and coterminous school board required to implement this initiative.
• Further research and study required to determine feasibility and advisability of this initiative.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Provincial legislation/ regulation requirements to be reviewed. Currently, a number of school boards in central and southern Ontario have
implemented advertising on school buses.
Time Required to Implement
Decision Dates /Milestones
March - September 1998 and beyond
Board decision required April 1998
Success Evaluation Criteria
If initiative is determined to be feasible and advisable, and there is a successful implementation of this initiative, transportation
expenditures will be offset by revenue to be generated.
E.13
//D
SECTION F: POTENTIAL CHANGES TO OTHER AREAS
Page
Option
School Year 1998 -99
($ Millions)
School Year 1999 -00
($ Millions)
F.1
Restructure delivery of custodial and maintenance services
.920
.920
F.2
Restructure all Program and Curriculum Services through a three -
year period
.600
.600
F.3
Restructure Program and Evaluation Services
.080
.080
F.4
Restructure all Program and Student Evaluation Services through a
three -year phase -out
.080
.080
F.5
Reduce Continuing Education budgets
.200
.200
F.6
Reduce costs in Information Technology
200
.200
F.7
Restructure Central Administration staffing positions
2.570
3.180
F.8
Close two administrative buildings
.300
.360
F.9
Restructure transportation delivery model
.100
.100
F.10
Relocate all transportation office staff to Greenbank Road
.026
.026
F.11
Discontinue central Volunteer Services function
.053
.053
F.12
Discontinue the Employee Assistance Program and functions
.300
.300
F.13
Eliminate Staff Development and Training
.740
.740
F.14
Restructure Salary and Benefit packages
3.800
3.800
F.15
Reduce cost of Occasional Teachers
.080
.080
F.16
Eliminate all Grants / Donations
.156
.156
F.17
Eliminate all Board Memberships
.177
.177
F.18
Reduce Trustee Communications and Services expenditures
.040
.040
F.19
Reduce Mileage Rate
.040
.040
r r r
Ottawa - Carleton District School Board i
BUDGET CHANGE OPTIONS
Option Restructure delivery of custodial and maintenance services. Harmonize level of custodial staffing throughout the District.
- all elementary schools to have one custodian during the day
- reduction in secondary school day shift numbers so all secondary schools are staffed consistently.
Potential Cost Saving
In 1998 -1999 $600,000
In 1999 -2000 $780,000
Annualized Saving $780,000
Date Starting September 1998
Required Investment /Cost to Implement
$100,000
Staff Impact
30 positions.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• decline in service levels in the schools losing staff.
• reduced flexibility for those schools - fewer staff to deploy on related custodial duties.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements.
Time Required to Implement
Decision Dates /Milestones
Four months.
- Board approval of staff level.
- Meeting with principals.
- Publication of standards.
Success Evaluation Criteria
Clean schools with adequate custodial service.
F.1
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure delivery of custodial and maintenance services. Reduce family of schools maintenance staff.
Potential Cost Savine
In 1998 -1999 Net $270,000
In 1999 -2000 Net $270,000 to $410,000
Annualized Saving $270,000 to $410,000
Date September 1998
Required Investment /Cost to Implement
Retraining of remaining staff.
Staff Impact
12 positions (1 Carpenter, 11 Site Stationary Engineers)
Impact of Change (e.g., on Student Education, School Community, Board -wide)
At present each family of schools have a site stationary engineer. This option would reduce the stationary engineers to one per each two family
of schools. The focus of the jobs would return to maintaining the mechanical systems of the Board's buildings.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements.
Time Required to Implement
Decision Dates /Milestones
Four months.
Board approval at staffing levels.
Meeting with principals.
Success Evaluation Criteria
Maintenance of physical plant equipment in schools.
F.1.1
L01 c, c,
1
1
r r i•°
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure delivery of custodial and maintenance services. Reduce trucking services.
Potential Cost Savine
In 1998 -1999 $50,000
In 1999 -2000 $50,000 to $93,000
Annualized Saving $50,000 to $93,000
Date
Required Investment /Cost to Implement
None, if delivery schedule can be adjusted.
Staff Impact
3 positions
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The change will reduce the availability of "free" delivery services for the Board's sites. The service would be replaced with contract service on an
as need basis. This would be arranged by areas of the region on pre - scheduled days, ending immediate response.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements.
Time Required to Implement
Decision Dates /Milestones
Four months.
Board approval at staffing level.
Success Evaluation Criteria
Smooth operation of truck service delivery system.
F.1.2
w
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure delivery of custodial and maintenance services. Harmonize level of custodial staffing throughout the District.
- all elementary schools to have one custodian during the day
- reduction in secondary school day shift numbers so all secondary schools are staffed consistently.
Potential Cost Saving
In 1998 -1999 $600,000
In 1999 -2000 $780,000
Annualized Saving $780,000
Date Starting September 1998
Required Investment /Cost to Implement
$100,000
Staff Impact
30 positions.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
This option will change the staffing formula for schools in the former OBE to the same basis used by the former CBE. The result would be to
have all elementary schools with one custodian during the day. Secondary school custodian allocation is based on enrolment and square footage.
The change would reduce the formula for former OBE schools.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Collective Agreements.
Time Required to Implement
Decision Dates /Milestones
Four months.
- Board approval of staff level.
- Meeting with principals.
- Publication of standards.
Success Evaluation Criteria
Clean schools with adequate custodial service.
F.1.3
LV 4601, (40*4
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Phase out Program and Curriculum over a three -year period.
Potential Cost Saving
In 1998 -1999 $600,000
Annualized Saving $1.2 M
Date
Required Investment /Cost to Implement
Staff Impact
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• Return all curriculum support staff to schools.
Lack of consistency in curriculum implementation across the system if this becomes totally school- based.
• Increased redundancy for teachers.
Decision Dates /Milestones
• No professional development for teachers.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• loss of Board -wide accountability for curriculum implementation evaluation and development.
• loss of curriculum implementation initiatives at the Board level for the system.
• loss of central support for report cards, IT integration, secondary restructuring, curriculum development at elementary level.
• loss of support in terms of community issues or reports on specific issues for Board.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Major shift in focus in terms of who delivers curriculum development, implementation and evaluation.
Lack of consistency in curriculum implementation across the system if this becomes totally school- based.
Time Required to Implement
Decision Dates /Milestones
3 years.
Evaluation at each point - June 30, 1998, 1999, 2000
Success Evaluation Criteria
In Year 1, a restructured Program and Curriculum Services Department will offer limited services to schools and the Board.
In Year 2, a radically down -sized department would be able to respond to Board issues only.
In Year 3, all initiatives will be school- based.
F.2
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure Program and Student Evaluation
Potential Cost Saving
In 1998 -1999 $80,000
Annualized Saving $80,000
Date September 1998 - August 1999
Required Investment /Cost to Implement
N/A
Staff Impact
Downsizing of joint staffs. Bumping to take place as per contract.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Professional development and support for teachers in evaluation and accountability will be lost.
• Ability to respond to accountability practices (EQAO, TIMMS) will be limited.
• School profile project will be restructured.
• Board examination Project restructured.
• Loss of support in terms of community issues and /or reports for the Board.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
September 1, 1998
Success Evaluation Criteria
A restructured Program and Student Evaluation Department will offer limited services to schools and the Board.
F.3
44w,
AWN
T " r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Phase out Program and Student Evaluation over a three -year period.
Potential Cost Saving
In 1998 -1999 $80,000
Annualized Saving $
Date
Required Investment /Cost to Implement
Staff Impact
Lay off or re deployment of all Program and Student Evaluation staff.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• loss of system and interpretation of program and student evaluation initiatives - accountability.
• loss of ability to respond to specific needs or initiatives at a system level.
• loss of central support in terms of community issues or reports on specific issues to the Board.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• MOET expectations with respect to accountability would be difficult to address.
• Increased training needs for principals, teachers and school councils.
• Ability as a Board to respond to Ministry queries and initiatives.
Time Required to Implement
Decision Dates /Milestones
3 years
June 1998,1999, 2000
Success Evaluation Criteria
Program and Student Evaluation is totally school- based, without central direction or support.
FA
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Maintain the Continuing Education Department on a cost recoverable basis. Programs to include: Specialty Skills and Interest; Adult
Basic Education; Language Instruction for New Canadians; Extra - Curricular Creative Arts Program; Adult ESL; Community Use of
Schools; Staff Training Facilitator, Summer and Night School Credit Programs; International Language Program and Independent
Study Courses.
Potential Cost Saving
In 1998 -1999 will be reduced by $200,000 by the elimination of 4 staff
Annualized Saving $200,000
positions.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Date 1998 -99 school year.
Time Required to Implement
Required Investment /Cost to Implement
Staff Impact - Loss of 4 positions. Bumping by individuals in the
Information about the Continuing Education grants is required to make
system as per contract.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• this cost recoverable approach will allow the OCDSB to maintain a Continuing Education program in all the above areas at no cost to the
Board, through a combination of fees, Continuing Education grants and other ABE /ESL grants (federal/ provincial).
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
• the cost recoverable mandate will incorporate funding available from MOET for Continuing Education programs.
Time Required to Implement
Decision Dates /Milestones
By August 31,1998
Information about the Continuing Education grants is required to make
this decision.
Success Evaluation Criteria
Continuing Education offers complete program as listed on a cost - recovery basis.
F.5
(awl" (MOO,
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce cost in Information Technology
Potential Cost Savine
In 1998 -1999 $200,000
Annualized Saving $200,000
Date
Required Investment /Cost to Implement
Staff Impact
(Mainframe and staff reduction)
• redeployment of mainframe staff to support services.
Decision Dates /Milestones
• increased workload for remaining staff.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• eliminate OBE mainframe by October 31, 1998
• consolidate licensing, client- server issues across two former Boards.
• Slower response and broadening of timelines for several ongoing projects, i.e., conversion to IPPS
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
October 31, 1998 - to turn off former OBE mainframe
August 31,1998
Success Evaluation Criteria
I.T. operates proactively with a $200,000 cut across its budgets, moving to client- server basis.
F.6
Ottawa - Carleton District School Board
�O
BUDGET CHANGE OPTIONS
Option Restructure Central Administration staffing positions (excluding the Special Education and Student Services department, the
Program and Information Technology departments and the E.A.P. service which are dealt with in separate Budget Change
Options sheets).
Potential Cost Savin¢
In 1998 -1999 $2,570,000
Annualized Saving $3,180,000
Date No later that September, 1998.
Required Investment /Cost to Implement
Staff Impact
• Severance costs.
See below in the "Impact of the Change" section.
• Costs to improve the information technology and the use of that
information technology to provide assistance given the reduced
Director's Office
number of staff positions.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The reductions in central administration staffing positions will have a significant effect on the types of services and the level of services that will be provided to
trustees, schools, staff, federation /unions, and the community, including school councils and parents.
The reductions in central administration staffing positions (excluding those areas noted above which are being dealt with on separate sheets) is summarized as
follows:
Current Proposed Reduction Reduction in Positions as
Staffing in Positions a Percentage of
Department (s) Level F.T.E. Current Staffing Levels Notes
All Superintendents and their
Administrative Support Staff
26.0
4.0
15.4%
1 Superintendent and 1 Administrative Support
reduced as of September, 1998 and the
position
other Superintendent and Administrative
Director's Office
Support positions as of September, 1999.
Board Services
37.5
9.0
24.0%
Communications
Human Resources
58.7
18.7
31.9%
Business Departments
ositions as of September,
1999; these numbers are
subject to further review and
125.0
28.5
22.8%
21.5 positions effective September, 1998 and a
may be adjusted.
further 7.0
Administration and Planning
Services
23.0
5.0
21.7%
(Incl. Transportation).
School Operations
2.0
2.0
100.0%
1 -position effective September, 1998 and the
oher position effective September, 1999.
L 4 L
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Restructure Central Administration (continued)
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Employment standards provisions, collective agreement provisions, provisions of the non - affiliated employee handbook, policies of the
former boards and the common law will provide some requirements for severance payment- related costs (including any service gratuity). These
severance - related costs do not prevent the reduction in the number of staff positions but they may reduce the savings achieved in the first year
(1998 -99).
Time Required to Implement
Four to six months
Success Evaluation Criteria
Decision Dates /Milestones
Board approval of the budget.
A reduction in central administration staff costs, while allowing the system to continue to operate (especially during the transition to the new
funding model).
F.7 �P
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Close two administration buildings:
- Gilmour
- Brook Lane
Potential Cost Savin
In 1998 -1999 $300,000 Annualized Saving $360,000
In 1999 -2000 $360,000 Date September 1998
Required Investment /Cost to Implement Staff Impact
$60,000
6 Staff
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• Staff will be required to move locations.
• Courses /meetings will have to be held elsewhere.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement Decision Dates /Milestones
Four months. Board approval.
Design of space for relocated staff.
Fit -up of space.
Move.
Success Evaluation Criteria
Completed move and mothballed facilities.
� c e (UV
r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Restructure transportation delivery model
Potential Cost Saving
In 1998 -1999 Net savings of $100,000
Annualized Saving $100,000
Date Effective September 1998
Required Investment /Cost to Implement
Staff Impact
Decision Dates/ Milestones
School bus drivers positions become redundant. Based on current
Subject To Collective Agreement
Collective Agreement Provisions, other positions would have to be
Comparable work for staff affected by the contracting out of these six routes.
found for affected staff.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
None
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Current Collective Agreement governing the former OBE bus drivers.
Time Required to Implement
Decision Dates/ Milestones
March - September 1998
Subject To Collective Agreement
Success Evaluation Criteria
Comparable work for staff affected by the contracting out of these six routes.
Reduced transportation expenditures and continued delivery of student transportation service.
F.9
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option "H" - Cancellation of Lease of Space for former OBE Transportation Department
Potential Cost Saving
In 1998 -1999
Effective April 1998
Annualized Saving $ 26,000
Date Effective April 1998
Required Investment /Cost to Implement
Relocation costs.
Staff Impact
N/A
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Integration of two departments will increase transportation operational efficiencies.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None
Time Required to Implement
Decision Dates /Milestones
To be implemented April 1998
April 1998
Success Evaluation Criteria
Effective and efficient delivery of a student transportation system.
c. c,
r^ r^ r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Volunteer Services
Eliminate Co- ordinator position and support budgets.
Potential Cost Saving
In 1998 -1999
Co- ordinator of Volunteers salary $46,200
Annualized Saving $53,000
Travel /Supplies /Printing $6,800
Possible reduction in number of volunteers and their involvement with students and school activities.
$53,000
Date Beginning September 1998.
Required Investment /Cost to Implement
Staff Impact
N/A
Potential bumping.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• all screening and training of volunteers will be done by school principals for their own schools.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Possible reduction in number of volunteers and their involvement with students and school activities.
Time Required to Implement
Decision Dates /Milestones
N/A
Service ends June 30,1998.
Success Evaluation Criteria
Anecdotal feedback from principals.
F.11 1
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Discontinue Employee Assistant Program (E.A.P.) and Functions
Potential Cost Saving
In 1998 -1999 $300,000
Annualized Saving $300,000
Date
September, 1998
Required In to Implement Staff Impact
No direct costs but there may be indirect costs in terms of the impact on 2.8 full -time equivalent positions (4 employees)
the system [Terminate contract with service providers (for former CBE)
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The employee assistance function is currently being provided in two ways. For former OBE employees there is an in -house service provided by
four employees (2.8 F.T.E. positions). The annual cost of this in -house services is approximately $180,000. For former CBE employees this
service is provided by a contracted service provider. The annual cost of this contract is approximately $80,000 (based upon the 1997 costs).
If the employee assistance programs and functions were to be discontinued then the counseling and support functions currently being provided to
employees would no longer be provided. These services and functions provide assistance to employees in dealing with a variety of concerns
which impact not only on employees' personal lives but also may impact on their performance in the workplace. For example, these services
and functions assist employees receiving layoff notices in coping with the stresses resulting from such notices. As a result, in the absence of
these services there may be an indirect cost to the Board in terms of employee attendance/ absences.
An alternative to the discontinuation of the E.A.P. services and functions may be to restructure the services provided and review the delivery
options in order to reduce the costs, especially those costs associated with the in -house service offered to employees of the former OBE.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
An employee assistance program is not included amongst the benefits which must be provided to employees in any of the current collective
agreements except for the collective agreement between PASU (Professional Administrative Services Unit) of the former OBE. [However, the
PASU collective agreement does not specify the manner in which "an employer- funded counseling is be
service" to provided to members of the
bargaining unit.)
Time Required to Implement Decision Dates /Milestones
Three months (depending upon whether the overall service is to be A final decision on the continuation (or restructuring) of the employee
restructured or eliminated.
assistance program and functions be made by June, 1998 or earlier.
Success Evaluation Criteria
4600-� Lol (W
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Eliminate Staff Development Function
Potential Cost Saving
In 1998 -1999 $740,000
Annualized Saving $740,000
Date
Required Investment /Cost to Implement
Staff Impact
N/A
1 Academic position and 6 admin. and support positions if proposed
Time Required to Implement
model used as basis.
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• limited leadership development.
• limited retraining for deployed staff.
• reduced capacity to review, revise and develop new processes for staff appraisal and selection.
• reduced inservice opportunities for all staff.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
N/A
Time Required to Implement
Decision Dates /Milestones
Could be implemented immediately.
By late spring to re deploy staff with C.A. associations/ implications.
Success Evaluation Criteria
All staff development, selection and appraisal processes handled effectively by other Human Resources staff.
'V
F.13
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Restructure Salary and Benefits Packages
Potential Cost Saving
In 1998 -1999 $3,800,00
Annualized Saving $3,800,00
Date September, 1998
Required Investment /Cost to Implement
Nil.
Staff Impact
No loss of positions
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• there is the potential for this option to have a further impact (negatively) on the morale and stress levels of staff in the system. This is
especially likely given the recent layoff notices and given the limited salary adjustments which have been implemented during the last
four to five years.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Any salary and benefit restructuring savings could only be achieved through the collective bargaining process with representatives of all of
the various employee groups.
Time Required to Implement
Decision Dates /Milestones
Will depend upon the timeframe within which such restructuring can
August, 1998 (for implementation date of September, 1998.
be negotiated.
Success Evaluation Criteria
� � L
r r r
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce cost of occasional teachers
Potential Cost Saving
In 1998 -1999 $80,000
Annualized Saving $80,000
Date September, 1998
Required Investment /Cost to Implement
Staff Impact
Nil.
No loss of regular staff positions but there could be a reduction in the
• there is the potential for this option to have a further impact (negatively) on the morale and stress levels of staff in the system.
use of occasional teachers (dependent upon the manner in which this
Decision Dates /Milestones
saving is implemented).
Impact of Change (e.g., on Student Education, School Community, Board -wide)
• cost of occasional teachers reduced by reducing the usage of occasional teachers
• the manner in which teacher absences are covered
• a potential impact on the instruction received by students during a teacher's absence.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
Any reduction in the cost of occasional teachers could be achieved through the collective bargaining process with representatives of the
elementary and the secondary occasional teachers.
• there is the potential for this option to have a further impact (negatively) on the morale and stress levels of staff in the system.
Time Required to Implement
Decision Dates /Milestones
Will depend upon the manner in which this reduction is implemented
and it may depend upon the time frame within which such
August, 1998 (for implementation date of September 1, 1998).
restructuring can be negotiated.
Success Evaluation Criteria
IV
F.15
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Eliminate all grants and donations paid by the Board from Central Funds.
Potential Cost Saving
In 1998 -1999 $156,000
In 1999 -2000 $156,000
Annualized Saving $156,000
Date Starting 1998 -1999
Required Investment /Cost to Implement
None.
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The Board will no longer have funds to contribute to worthy community causes including Central Choir, Safety Patrol Jamboree, Advisory
Committee on Enrichment, Advisory Committee on the Environment, Alternative Schools Advisory, Arts Advisory, A.Y. Jackson S.S.,
Bell H.S. - Yearbook, Cairine Wilson S.S., Canadian Educational Association, Central Choir, CHIP, Confederation H.S. - Yearbook,
Employment Equity Advisory, Environmental Projection, Focus on Future Advisory, Mental Health, Multiculturalism Advisory, Ottawa Board
of Education Elementary School Athletic Association, Ottawa- Carleton Learning Foundation, Sir Robert Borden H.S., Sir Wilfrid
Laurier S.S., Status of Women, Special Education, vista 1997 - Merivale H.S. - Yearbook, West Carleton S.S., World of Work.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement
Decision Dates/ Milestones
Immediate.
Board Motion.
Notification to affected groups.
Success Evaluation Criteria
N/A
460-e (60� 46000
Ottawa - Carleton District School Board
r r r
BUDGET CHANGE OPTIONS
Option Eliminate all Board level memberships in Ontario organizations.
Potential Cost Saving
In 1998 -1999 $177,000
In 1999 -2000 $177,000
Annualized Saving $177,000
Date Starting 1998 -1999
Required Investment /Cost to Implement
None.
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The Board will no longer be a member of Ontario Public School Board Association, other province wide education sector organizations,
Ottawa - Carleton Board of Trade, Adult Crossing Guards, Canadian Auto Association, Canadian Council for Inner City, Friends of the Earth,
Miscellaneous Memberships, Ottawa Athletic, Ontario Association for Curriculum Development, Ontario Education Research, Ontario Police
Department (Safety Patrol), Ontario Student Exchange, Other Championships, Ottawa Carleton Science Olympics, Ottawa Music & Dance
Festival, Pollution Probe, Recycling Council of Ontario, The Chance to Give. This will lessen the Board's involvement in influencing public
policies and its contacts with other boards of education.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement
Decision Dates/ Milestones
As memberships expire.
Board Motion.
Notification to relevant 'organizations.
Success Evaluation Criteria
N/A
F.17
Ottawa - Carleton District School Board
BUDGET CHANGE OPTIONS
Option Reduce Trustee Communication and Services expenditures.
Potential Cost Savine
In 1998 -1999 $40,000
In 1999 -2000 $40,000
Annualized Saving $40,000
Date Starting 1998 -1999
Required Investment /Cost to Implement
None.
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
Trustees will have less funds for Communication and Training and Development. This will lessen their ability to provide information to their
zones.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement
Decision Dates/ Milestones
Immediate.
Board Motion.
Success Evaluation Criteria
N/A
(aw, (Wo, 440w
r Ottawa - Carleton �istrict School Board r
BUDGET CHANGE OPTIONS
Option Reduce Mileage rates set in predecessor board policies and procedures.
Potential Cost Saving
In 1998 -1999 $40,000
In 1999 -2000 $40,000
Annualized Saving $40,000
Date starting 1998 -1999
Required Investment /Cost to Implement
None
Staff Impact
Impact of Change (e.g., on Student Education, School Community, Board -wide)
The two predecessor boards had different mileage rates. Using the lower of the two ($.29¢) would reduce mileage payments.
Decision Constraints (e.g., Collective Agreements, Legislation, Board Policies and Practices)
None.
Time Required to Implement
Decision Dates /Milestones
Immediate.
Board Motion.
Success Evaluation Criteria
None.
F.19 U�!
Appendix B
At the Board meeting of 9 March 1998, staff was asked to prepare a brief summary of some principles
and methodologies for public consultation.
At the Trustee Planning Session held on 6-7 March 1998, trustees affirmed as one of their values that
opportunities should be provided for public consultation, including consultation with the under
community beyond the school.
Some Notes re: Principles and Methodologies for Budget Consultation
Successful public consultation includes:
• a purpose and objectives that are well understood
• a well- described process and timeline
• readable, comprehensible public information
• sufficient flexibility to allow changes in response to emerging situations of needs
• clearly defined roles, responsibilities and authority for members of the consultation team
•
• commitment to respect and support the process
•
• clear explanation of how gathered information will be used
• simplicity and specificity
• trained employees with excellent communication skills and adequate time
• a commitment to communication and process management
Source: McMillan, B. and Murgatroyd, S. Opening the Door: Improving Decisions Through
Public Consultation, 1994
Terms of reference are required for carrying out a successful public consultation. These should
include:
• explanation of the reason why a decision is needed at this time
• a description of the decision to be made
• the reason or reasons for consulting constituent communities
• how the information gathered will be used
• the scope of the consultation - who? how much? what limitations?
• the outcomes the Board expects to achieve
Source: as above
3. Time Requirements for Budget Consultation
At the 9 March 1998 Board meeting, trustees expressed interest in one or more of the following
options:
Estimated amount of time required
for public consultation re: budget options
A. Random Sample
Telephone Survey
- contracted out -
B. Board survey of 151
school councils
to develop questionnaire
2 weeks
2 weeks
to re- test /make adaptations/ a rove
1 week
1 week
to send out to groups
.5 week
to conduct interviews (assume sample of 500)
.5 week
for school councils to gather responses at the
school level and prepare /fax back group
response
2 weeks (min.)
for data entry
1 week
1 week
for analysis/report
1 -2 weeks
1 -2 weeks
TOTAL
5.5 - 6.5 weeks
7.5 -8.5 weeks
Response to Trustee request of 9 March 1998 98.03.20
JES /js
F]
/a5�)
4. Estimated costs - Random Sample Telephone Survey
(based on preliminary discussions with two potentially interested firms):
Estimated base cost of "basic" survey 15 minutes long Firm A $15,000 - 20,000
(500 respondents) Firm B $20,000 - 26,000
Incremental cost for additional breakdowns (e.g. by such variables as parent /non-
parent, or parent of Kindergarten, elementary, secondary child /children)
Firm A $ unknown
Firm B $ [await reply]
5. Sample Size for Random Sample Survey
Although population size plays an important role for small populations, it plays an almost
nonexistent role for large populations (in this case, the number of public school supporters in
Ottawa - Carleton). The larger the population, the smaller the proportion of respondents to
total population required.
A sample size of 500 respondents would suffice for a random telephone survey of Ottawa -
Carleton public school supporters. However, it should be kept in mind that no breakdown by
sub -area of the Board's jurisdiction could be obtained with this number of responses. To
differentiate between, for example, the responses of public school supporters residing in Zone 1
and those residing in Zone 11, it would be necessary to obtain sufficient responses to produce
reasonably reliable results for each of the 12 zones. This could triple to quadruple the total
sample size needed, and thus increase the cost of the survey.
6. Survey of OCDSB School Councils by the Board
A set of questions would be answered by each school council as a whole (potential total returns:
n =151). Assuming councils were willing and able to gather opinions from their school
community and fax back the council's group response within a two-week period, consultation by
each council with its school community would take place from approximately 16-30 April 1998.
A report would then be prepared for presentation to the Budget Committee prior to the 25 May
Board budget approval date. Note that a high percentage rate of survey returns would be
required for the results to be considered representative of the Board's school community as a
whole.
7. Survey Questions
A common set of questions for use when conducting the survey or surveys approved by the Board
would need to be finalized immediately following the expected 9 April 1998 release of the
staff - recommended budget. Prior to drafting the questions, it is essential to have the Board
establish terms of reference (see 2. above) for the survey or surveys, including the expected
outcomes in relation to budget decision- making.
JET /jsse to Trustee request o 9 Marc 1998 98.03.20