HomeMy WebLinkAbout06 Report 99-005 Attendance Boundary/Area Review.School Closure Study - Staff's Recommendations and Revised TimelinesOttawa - Carleton District School Board
21 December 1998
Report No. 99 -005 to Board
Re: Attendance Boundary/Area Review /School Closure Study -
Staff s Recommendations and Revised Timelines
ORIGINATOR: Rose -Marie Batley, Superintendent, Facilities and Physical Planning
Michael Carson, Manager, Facilities/ Planning /Transportation
Estelle Butler, Planner
Phil Dawes, Planner
Marc Labelle, Planner
Janet Sauriol, Planner
Mark Smith, Planner
Ian Baxter, Planning Technician
Diana Dolezal, Planning Technician
Wendy Norton, Planning Technician
PURPOSE:
1. To seek Board approval of staff's recommendations regarding a revised timeline and
process for the Attendance Boundary /Area Review /School Closure Study.
BACKGROUND:
On 24 November 1998, staff submitted a report to the Committee of the Whole
detailing staff's recommended options regarding proposed school closures for
September 1999.
Since that report, staff has provided Trustees with four (4) supplementary
information packages (dated December 1, 3, 10 and 18), several memoranda
containing specific information and /or responses to questions, a chronology of
information previously provided to Trustees and Community Working Groups and a
proposal to revise the timelines and process for the study by extending the date for
finaldecisions to the end of February 1999.
4. As noted in our memorandum to Trustees dated 10 December 1998, while it is true that
the recent announcement from the Minister of Education diminished the urgency to
identify "closed" facilities by 31 December 1998, the closure of schools for
September 1999 implementation will begin to reduce the Board's surplus capacity and
rationalize space to ensure that future educational facility requirements for growth
areas are met. This reduction in the Board's portfolio of properties will allow for
better use of plant resources in order to provide safe, clean learning environments.
rN
5. In the 10 December 1998 memorandum, staff noted that minimizing disruption to
students was a significant factor in determining potential schools for closure in the first
phase of the process. The ten (10) schools identified by staff for closure for
September 1999 represented less than 3% of the total student population and addresses
45% of the excess capacity in the OCDSB. As such, staff believes that the
identification of these schools would cause the least amount of disruption to the fewest
number of students who should only experience one move caused by school closures.
The closure of the ten (10) sites identified by staff in the first phase would potentially
allow the Board to be eligible for new pupil place grants (NPPG) within the next 3 -5
years at the elementary level. Additional secondary schools, over and above McArthur
and Confederation, would need to be closed in order to receive significant grants at the
secondary level.
It should be highlighted that the reduction of excess capacity does not address the
needs of over 7,000 students currently housed in portable classrooms. This can only be
met if an equivalent amount of permanent space is eliminated.
A decision not to close any schools for September 1999 would make it much more
difficult to reduce operating and maintenance costs.
The 10 December 1998 memorandum indicated that extending the 21 December 1998
deadline for making final decisions with respect to school closures for September 1999
will allow staff to address additional concerns expressed by Trustees and the public yet
be in compliance with the Ministry of Education and Training requirements and the
Board's policies and procedures. For example, staff will be able to:
*bring to Trustees for decisions in January, policies /procedures on
Designated School /Transfers, Transportation Entitlements, and
Accommodation Guidelines;
•provide recommendations regarding Program Accommodation Review
(Secondary and Special Education decisions slated for 27 January 1999);
•provide details on the "home schools" for students in the ten (10) sites closed
and the relocation sites for Special Education students and information on
where other programs will be made available for the students in these ten (10)
sites;
•finalize attendance boundaries in January for community consultation in
January;
•give more opportunity to the schools affected to respond to staff's relocation
proposals.
10. Regardless of the Board's decision, it is imperative that issues regarding outstanding
boundaries for Planning Area 10 (Kanata), Planning Area 1 (re: the opening of the new
Cumberland E.S. September 1999) and Confederation H.S. (re: the opening of John
McCrae S.S. September 1999) be addressed as part of Phase I of this process.
F]
STATUS:
11. Staff recognizes that some schools, have in the past, been able to accommodate uses
other than day school education programs. (i.e., day care operations, after school
programs, interest courses, community uses, etc.). The OCDSB and its predecessors
strongly supported these initiatives. They enrich opportunities for our students and
they add value to the communities. When school boards could generate revenue
through taxes, trustees had more latitude in decisions around these activities. This is
no longer the case and the Provinicial funding model does not provide for these types of
uses. In order to maintain the support school boards have provided to these groups,
other sources of funds would have to be found (i.e., boards may need to look at
reciprocal/ lease agreements with these parties that result in full cost recovery
including a capital component).
12. Staff recognizes that there are Trustees and members of the public who believe that
additional time and information is required in order to make a knowledgeable decision
regarding schools to be closed for implementation September 1999. The Ministry of
Education and Training's change to the final 31 December 1998 deadline will allow
staff the opportunity to provide additional information and further clarification
regarding details on the "home schools" for students in the ten (10) sites identified for
closure for September 1999, the relocation of students in specialized programs, and final
attendance boundaries provided that an extension to Phase I of the process is approved
by Trustees. In addition, an extension to Phase I of the process will provide more
opportunity for the schools affected to respond to staff's relocation and revised
attendance boundary proposals and would be consistent with Board approved Policy
P.013.PLG.
It is important to understand that there is always an emotional element
associated with school closures. No amount of data provided to individuals can
address this aspect of school closures.
13. Elementary Panel:
It is staff's opinion that extending Phase I of the process to 22 February 1999, for a final
decision on elementary school closures for implementation September 1999, would allow
additional time for staff to:
•provide details regarding revised attendance boundaries;
*provide details regarding the relocation sites for Special Education students;
-provide details regarding the "home schools" for students in the ten (10) sites closed;
• examine suitable relocation options for day cares and other organizations currently
occupying space within the ten (10) sites identified;
and
*meet with school councils and school staff to discuss revised attendance boundaries as
a result of the schools approved for closure.
JD
14. Secondary Panel:
In terms of the secondary panel, staff believes that an extension to Phase I of the
process to 22 February 1999 would be prudent for decisions pertaining to McArthur H.S.
but may not be applicable to decisions surrounding Confederation H.S. for the following
reasons:
Confederation H.S.:
In accordance with the decisions approved in the 1994 Nepean Secondary School
Space Study, students residing in the Barrhaven area (including Heart's Desire and
rural Nepean areas within the Confederation H.S. attendance boundary), would be
directed to John McCrae S.S. for September 1999. The remaining students have been
given the option over the last several years to attend either Confederation H.S. or
their "newly" designated secondary school in accordance with the approved
attendance boundaries from the Nepean Secondary School Space Study.
In addition, there are 60 students currently attending Confederation H.S. in the High
Performance Athlete program. This group of students should be moved as a unit to
another school. The final decision regarding the relocation of the students in this
program is subject to further review however, a logical relocation site for these students
would be to John McCrae S.S. It is located adjacent to the Walter Baker Centre, and the
Nepean Sportsplex would still be within a reasonable travelling distance.
Once the students residing in the Barrhaven area are directed to John McCrae S.S. for
September 1999, there will be approximately 130 students remaining at
Confederation H.S. While there are obvious cost implications associated with trying
to operate a secondary school with less than 200 students, there are also problems
encountered in trying to provide sufficient options and programs for such a few number of
students. It should be noted that the utilization factor at Confederation H.S., once John
McCrae S.S. is operational, would be less than 20 %. As such, staff believes that a
decision to reaffirm the former Carleton Board of Education's approval to close
Confederation H.S. can be made on 21 December 1998 without jeopardizing Phase I of
this process. (See Appendix A attached for details.)
McArthur H.S.:
Although staff believes that a number of the McArthur basic level education students
can be redirected to Sir Guy Carleton S.S., there are a number of specialized programs at
McArthur H.S. that require further review with the Special Education and Student
Services Department staff to ensure that the most suitable location is determined based
on the individual needs of the students.
Concerns about the location of Sir Guy Carleton S.S. and the distances to be travelled
have been raised. Currently, the longest distances from which students travel to Sir
Guy Carleton S.S. are 53 km (West Carleton), 49 km (Rideau), 47 km (Osgoode) and
45 km (Cumberland). The longest distance students currently at McArthur H.S. would
have to travel to Sir Guy Carleton S.S. would be 43 km.
The current utilization factor for Sir Guy Carleton S.S. using an estimated 1998/99 ADE
is approximately 61 %; for McArthur H.S. the utilization factor, using an estimated
1998/99 ADE is approximately 32 %. While all schools tend to make use of any space
available, there is a difference between this type of space and space that is required or
funded for use.
15. It should be noted that an extension to Phase I of the process to 22 February 1999 will
(W have implications on staff's budget recommendations. The extension does not preclude
bringing forward a recommended budget. Instead, options would be created for Trustees
consideration.
RECOMMENDATIONS:
A. That Trustees reaffirm the former Carleton Board of Education's decision to close
Confederation H.S. for September 1999.
B. That Phase I of the process for the Attendance Boundary/Area Review /School Closure
Study be revised to include the remaining nine (9) school sites with timelines in
accordance with Appendix B attached resulting in a final decision to close schools for
implementation September 1999 being made on 22 February 1999.
C. That staff be directed to bring back to Board for approval, a revised Phase II for the
Attendance Boundary/Area Review /School Closure Study process.
James P. Grieve
Director of Education/
Secretary of the Board
Rose -Marie Batley
Superintendent of Facilities
Physical Planning
" ARLETON BOARD OF EDUCATION
APPENDIX A
SUBJECT FILE REF: 120 -8
CROSS REF:
Received by Board Minute:
Date:
EXCERPT from the Minutes of the Board of Education
Report Number: Date: 13 November 1995
306. Report No 12 Central Services Committee (Special), 30 October 1995
On a motion by Trustee Burnett, seconded by Trustee MacGregor, the Board received Report No.
12, Central Services Committee, dated 30 October 1995 (reference agenda item No. 9).
Trustee Burnett presented the report and seconded the recommendations therein, viz:
a ) Proposed Closure of Confederation High School
(Motion by Trustee MacGregor)
THAT the Board approve the closure of Confederation High School for regular day school
purposes, effective upon the opening of the new Barrhaven Secondary School.
Trustee Ridout questioned the process for funding of adult day programs. The Director noted
that, given the lack of information on capital grants, a decision has not yet been made on the future use
of Confederation H.S. When this information is available, the item will be brought back to the Board,
and detailed information on funding for adult day programs will be provided.
b) Disposition of Ramsavville Public School
(Motion by Trustee MacGregor, substituting for mover in Committee)
THAT staff be directed to undertake all necessary measures to declare Ramsayville Public
School dosed for regular day school purposes and the facility surplus to the needs to the Board,
effective upon the opening of the Sawmill Creek facility.
The motion includes an amendment by Trustee Morse, accepted by the mover and seconder, that
the measures would be taken upon the opening of the replacement facility. Staff noted that no undue
delay or detrimental effect on the process would occur if the motion included this additional phrase.
The report was received and the recommendations were adopted by the Board.
Chairman's Committee -1- 25 October 1995
Ottawa- Carleton District School Board APPENDIX B o'
Attendance Boundary/Area Review /School Closure Study - Revised Timeline
DATE
ACTIVITY
PHASE 1: IMPLEMENTATION FOR SEPTEMBER 1999
ovember 3;1998- :Committee of the Whole: Presentation of CWG Options
ove»rber1", 998 Committee of the Whole: Presentation of CWG Options
ovember10,,1998 .d Committee of the Whole: Presentation of CWG Options
November9 - 20,1998 Staffs examination of CWG submissions and development of potential
a options for submission to Committee of the Whole; in particular addressing
outstanding issues for Planning Area 10 (Kanata) and addressing issues
related to Planninz Areal (opening of new Cumberland E.S.)
[Nov ember23,1998_ Report to Board re: Revised Attendance Boundary /Area Review /School I
Closure Study Process and Timelines
November24,1998 Articulation with School Principals /Vice - Principals, Unions and
Administrative and Support Managers re: preliminary school closure list
and attendance boundary changes for implementation September 1999
'J"nber24 1998 Committee of the Whole: Presentation of staff's options for
implementation September 1999 (Elimination of 26 November 1998 date)
ecember 1, 1998 & Committee of the Whole: Response to staffs recommendations
ecember 8,1998 re: school closures for September 1999.
Additional feedback from the public on staffs recommendations can be
received on 10 December 1998 with the option of retaining 17 December 1998
to receive additional feedback if required.
xember 10, 1998
xember 21, 1998
irly January 1999
nuary 1999
nuary 11 -21, 1999
the Whole: Deliberation of Staff's Recommendations
Board Meeting: Decisions re staffs recommendations on school
and attendance boundary review for September 1999 imvlemen
of Board reaffirmation of closure of Confederation HS
Review for September 1999 for Kanata
liaison with school councils and Principals re: potential attendance
daries for the redirection of students from closed sites.
Physical Planning /Revised 18 December 1998
I.
Ottawa - Carleton District School Board APPENDIX B
Attendance Boundary /Area Review /School Closure Study - Revised Timeline
DATE
ACTIVITY
January 14, 1999
Consultation with Program, Quality Assurance and Development department
and Special Education and Student Services department re: relocation of
students in specialized programs. '
January 25, 1999
Board approval of Policies /Procedures re: Designated School and Transfers,
Accomodation Review, and Transportation Entitlements.
(Consultation with OCASC and Principals in the development of the
policy /procedure)
January 27,1999
Completion of Program Review (re: secondary school program delivery
options - magnet schools, composite schools, specialized programs and
semestering)
January 28,1999 Q 5
C)
Committee of the Whole: Presentation of staff's detailed plan re: home
chools for students from closed sites and revised attendance boundaries
February 2,1999
February 4, 1999
February 9, 1999
Committee of the Whole: Response to staffs presentation by those from
schools directly affected in Phase 1
February 16, 1999
February 18,1999 11revised
Committee of the Whole: Deliberation of staff's recommendations for
attendance boundaries and school closures for September 1999
February 22, 1999
Final decisions re: 1. Attendance Boundary Adjustments for Planning
Areas 1 & 10; 2. Other school closure /attendance boundary adjustments
r September 1999 implementation
February 23, 1999 - August 31, 1999
Communication and implementation of final decisions effective
September 1999
Physical Planning /Revised 18 December 1998
PI
PI