Loading...
HomeMy WebLinkAboutPR 617 FAC - Energy Management -1- PR.617.FAC PROCEDURE PR.617.FAC TITLE: ENERGY MANAGEMENT Date issued: December 2000 Date revised: Authorization: Senior Staff: 07 June 2000 1.0 OBJECTIVE To create a process and establish responsibilities for staff in complying with the Board’s energy management policy. 2.0 DEFINITIONS In this procedure, 2.1 Energy is defined as encompassing electricity, fossil fuels (gas and oil), and water consumption and use. 3.0 RESPONSIBILITY Superintendent of Facilities and Physical Planning 4.0 PROCEDURES 4.1 Responsibilities of Facilities and Physical Planning: a) Budget: Project annual energy use and remain within the approved budget. b) Facility Renewal Program Development: Develop facility and equipment upgrade, retrofit and replacement programs that lead to reduced consumption or lower operating costs. Identify and implement programs that are energy neutral while providing for an enhanced learning environment. c) Facility Operations: Maintain and operate all facilities and equipment for optimum consumption. Encourage the closing of underutilized classrooms, wings or sections of buildings where enrolment has declined. -2- PR.617.FAC d) New Construction and Renovation or Retrofit Project Development: Design new construction or additions for optimum conservation and efficiency subject to school program constraints and project budget allocations. e) Invoice Verification and Validation: Track, verify, maintain and approve all energy-related expenditures. f) Guidelines: Develop, maintain, and implement operational guidelines and equipment parameters/specifications for all Board equipment, including lighting, heating, air conditioning, ventilation, plumbing fixtures, water usage, and Board vehicles (fleet). g) Education and Research: Establish education programs which engender an eth ic of energy conservation and provide the opportunity for in-service training for staff on the need for conservation. h) Product Selection: Approve the installation of any type of built-in, powered equipment in OCDSB facilities. 4.2 Appropriate summer, winter and holiday operating condition targets, temperature ranges, setback parameters and equipment run schedules will be established and implemented. 4.3 Facilities and Physical Planning will develop and implement a strategic energy plan. The strategic plan will address issues such as short and long term cost projections, energy type and optimum mix, deregulation, information gathering, reporting, daily data logging, feedback to sites, exception reporting, and automated invoicing, and user feedback. 5.0 REFERENCE DOCUMENTS Board Policy P.097.FAC: Energy Management